<br />as permitted by paragraph 15.04 or as OWNER and
<br />CONTRACTOR may od1crwise agree in writing.
<br />
<br />LJ
<br />
<br />n
<br />
<br />6.19 CONTlUcrOR's General Wamurly and Guaranlee
<br />
<br />LJ
<br />
<br />A. CONTRACTOR warrants and guaranlCeS to
<br />OWNER. ENGINEER, and ENGINEER's ConsulWlts that
<br />all Work will be in accordance wilh rhe Contract D~ents
<br />and wiJIllOt be dcfective. CONTRACTOR's warranty and
<br />guarantee hereunder cxcludes defects or damage caused by:
<br />
<br />!I
<br />
<br />LJ
<br />
<br />n
<br />
<br />LJ
<br />
<br />1. abuse, modifacatioll, or improper maintenance or
<br />operation by persons olher dw1 CONTRACTOR, Sub.
<br />coDtractors, Suppliers, or any other individual or entity
<br />for whom CONTRACTOR is responsible; or
<br />
<br />. n
<br />
<br />LJ
<br />
<br />n
<br />
<br />2. normal wear and tear undcr normal usage.
<br />
<br />LJ
<br />
<br />B. CONTRACTOR's obligation to perform and
<br />complete rhe Work in accordance with rhe Conuact
<br />Documcnu sball be absolute. None of thc foUowing will
<br />constitute an accepwu:c of Work that is DOt in accordance
<br />with thc Contract Documents or a release of
<br />CONTRACTOR's obligation to perform the Work in
<br />accordance with che Contract Docwucots:
<br />
<br />n
<br />
<br />LJ
<br />
<br />11
<br />
<br />LJ
<br />
<br />1. observations by ENGINEER;
<br />
<br />II
<br />
<br />LJ
<br />
<br />2. recommendation by ENGINEER or payment by
<br />OWNER of any progress or fmal paymcDt;
<br />
<br />n
<br />
<br />LJ
<br />
<br />3. rhe issuaDce of a cenificate of Substantial
<br />Completion by ENGINEER or any paymcDl related
<br />therero by OWNER;
<br />
<br />4. use or ~ of the Wmk or any pan IbeRlof
<br />byOWNER; ..
<br />
<br />11
<br />
<br />LJ
<br />
<br />11
<br />
<br />LJ
<br />
<br />s. any acccptaDCC by OWNER or any failure to do'.
<br />
<br />so;
<br />
<br />11
<br />
<br />LJ
<br />
<br />6. any review and approval ofa Shop Drawing or
<br />Sample submittal or Ibe issuance of a notice of acceptabil-
<br />ity by ENGINEER:
<br />
<br />II
<br />
<br />LJ
<br />
<br />7. any inspcc:tion, test, or 'approval by others; or
<br />
<br />n
<br />
<br />8. any correction of defective Work by OWNER..
<br />
<br />LJ
<br />
<br />6.20 Jlllkmnifictllion
<br />
<br />A. To Ibe fullest exIaIt permitted by Laws aad Regula-
<br />DOos. CONTRACTOR IbaIl iDdemn1fy aDd hold barmlcss
<br />OWNER. ENGINEER. BNGlNEBR.'s CoasultaDlS, IDd die
<br />officeR, direccora, panuers, employccs. IBCDlS, aad other
<br />coasulfallls IDd subooattIcton of each ad III.)' of them from
<br />
<br />00700 - 2S
<br />
<br />n
<br />
<br />LJ
<br />
<br />n
<br />
<br />LJ
<br />
<br />n
<br />
<br />LJ
<br />
<br />and against all claims, costs. losses, and damages (including
<br />but not limited to all fees aDd charges of engiacen,
<br />architects, attorneys, and other professioo.als and all coun or
<br />arbitration or other dispute resolution costs) arising out of or
<br />relating to the performance of rhe Work, provided that any
<br />such claim, cost. loss, or damagc:
<br />
<br />1. is anributable to bodily injwy, sickness, .disease,
<br />or dealh, or to injury to or destruction. of, tangible
<br />property (other than the Work itself), including the loss of
<br />use resulting therefrom; and
<br />
<br />2. is caused in whole or in pan by any acgligCDt act
<br />or omission of CONTRACTOR, any Subcontractor, any
<br />Supplier, or any individual or entity directly or indirectly
<br />employed by any of-them to perform any of the Work or
<br />anyone for whose. acts .any. of lhem may be liable,
<br />.regardless of _whether or. .DOt caused in part by any
<br />negligcnce or omission of an individual or entity indem-
<br />nifacd hereunder or wbcCher liability is i~ upon such
<br />indcmn.ificd party by Laws a.ad Regulations regardless of
<br />the negligence of any such individual or entity.
<br />
<br />B. In any and all claims against OWNERor ENGINEER
<br />or any of their respective consultants, agents, officers,
<br />directors, panners, or employees by any employee (or che
<br />survivor or personal representative of such cmployee) of
<br />CONTRACTOR, any Subcoottactor, any Supplier. or any
<br />individual or entity dircctly or iDdirect1y employed by any of
<br />them ro perform any of thc Work. or anyoDC for whose acts
<br />any of them may be liablc. the indemnification oblijation
<br />UDder paragraph 6.20.A sbaIl DOt be limited in any way by
<br />any limitation 011 the alDOUlll or type of ctam.scs,
<br />c:ompeIJ$IU;on. or beaefils payable by or for CONTRACTOR
<br />or any such s~, Supplier, or otber iDdividuaI or
<br />emi1y UDder worbrJ' compc:usatioa aces, disability bcD=fit
<br />. actsi'OC 0Cbt:r cmployec.beacfit:lCU.
<br />
<br />. :'. .C. 1be iDdemnification;obligatioos of CONTRACTOR
<br />under'paragrapb.6.20.A'SbaU'.DOt eXleDd to the liability of
<br />ENGINEER and ENGINEBR'. CoosHltants or to the
<br />officeR,. c:lirccton, partDCrI, employccs. agents, a.ad other
<br />consultants and SUbcontractoR of each aad any of them
<br />arising out of:
<br />
<br />1. the preparation or approval of, or the fallure to
<br />PrqNII'C or approve. maps. Draw.. opiDioDl. repol1S.
<br />surveys, Change Orders, desips. or SpecificatiODS; or
<br />
<br />2. giviD& direc:tioos or insttuctions. or failiDg to
<br />- give diem, if Ibat U die primary cause of cbc bUUl)' or
<br />cU&age.