Laserfiche WebLink
<br />rI <br /> <br />L.J <br /> <br />rI <br /> <br />L.J <br /> <br />" <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />rI <br /> <br />u <br /> <br />Il <br /> <br />C. <br /> <br />Project Mobilization <br /> <br />1. <br /> <br />The project mobilization item shall be administered in accordance with the <br />Florida Department of Transportation, Standard Specifications for Road & <br />Bridge Construction (latest edition); MOBILIZATION. <br /> <br />2. <br /> <br />The maximum amount allowed for the mobilization item shall be ten percent <br />(10%) of the total contract amount. <br /> <br />3. <br /> <br />Mobilization includes, but is not limited to, mobilization of equipment, all <br />surveying, all supervision, cost of all bonds and warranties, all permit fees, and <br />all insurance. <br /> <br />u 3.02 PROTECTION <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />3.03 <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />rI <br /> <br />L.J <br /> <br />rI <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />" <br /> <br />LJ <br /> <br />" <br /> <br />06/05 <br /> <br />LJ <br /> <br />A. <br /> <br />Where pavement, trees, shrubbery, fences or other property or surface structures have <br />been damaged, removed or disturbed by the Contractor, whether deliberately or through <br />failure to carry out the requirements of the Contract Documents, state laws, municipal <br />ordinances or the specific direction of the Engineer, or through failure to employ usual <br />and reasonable safeguards, such property and surface structures shall be replaced or <br />repaired at the expense of the Contractor to a condition equal to that before work began <br />within a time frame approved by the Engineer. <br /> <br />SUB MITT ALS <br /> <br />A. <br /> <br />On lump sum items, a complete schedule of values must be submitted at the pre- <br />construction meeting by the contractor. <br /> <br />END OF SECTION <br /> <br />01025-3 <br /> <br />03-4138.8 <br />