My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />SECTION 01090 <br /> <br />REFERENCES <br /> <br />PART 1 - GENERAL <br /> <br />" <br /> <br />1.01 GENERAL <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />11 <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />,', <br /> <br />A. <br /> <br />Applicable Publications: Whenever in these specifications references are made to <br />published specifications, codes, standards, or other requirements, it shall be understood <br />that wherever no date is specified, only the latest specifications, standards, or <br />requirements of the respective issuing agencies which have been published as of the date <br />that the WORK is advertised for bids, shall apply; except to the extent that said standards <br />or requirements may be in conflict with applicable laws, ordinances, or governing codes. <br />No requirements set forth herein or shown on the drawings shall be waived because of <br />any provision of, or omission from, said standards or requirements. <br /> <br />B. <br /> <br />Specialists, Assignments: In certain instances, specification text requires (or implies) that <br />specific work is to be assigned to specialists or expert entities, who must be engaged for <br />the performance of that work. Such assignments shall be recognized as special <br />requirements over which the CONTRACTOR has no choice or option. These <br />assignments shall not be interpreted so as to conflict with the enforcement of building <br />codes and similar regulations governing the WORK; also they are not intended to <br />interfere with local union jurisdiction settlements and similar conventions. Such <br />assignments are intended to establish which party or entity involved in a specific unit of <br />work is recognized as "expert" for the indicated construction processes or operations. <br />The final responsibility for fulfillment of the entire set of contract requirements remains <br />with the CONTRACTOR. <br /> <br />L.J 1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />(1 <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />(I <br /> <br />LJ <br /> <br />(I <br /> <br />u <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />06/05 <br /> <br />L.J <br /> <br />A. <br /> <br />Without limiting the generality of other requirements of the specifications, all work <br />specified herein shall conform to or exceed the requirements of the following documents <br />to the extent that the provisions of such documents are not in conflict with the <br />requirements ofthese Specifications nor the applicable codes. <br /> <br />B. <br /> <br />References herein to "Building Code" or SFBC shall mean the South Florida Building <br />Code. The latest edition of the code as approved and used at the local agency having <br />jurisdiction, shall apply to the WORK herein, including all addenda, modifications, <br />amendments, or other lawful changes thereto. <br /> <br />c. <br /> <br />In case of conflicts between codes, reference standards, drawings and other Contract <br />Documents, the most stringent requirements shall govern. All conflicts shall be brought <br />to the attention of the ENGINEER for clarifications and directions prior to ordering or <br />providing any materials or labor. The CONTRACTOR shall bid the most stringent <br />requirements. <br /> <br />01090-1 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.