My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />u <br /> <br />Il <br /> <br />LJ <br /> <br />r> <br /> <br />u <br /> <br />SECTION 01310 <br /> <br />CONSTRUCTION SCHEDULES <br /> <br />PART 1 - GENERAL <br /> <br />fl <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />LJ <br /> <br />A. <br /> <br />r> <br /> <br />LJ <br /> <br />(l <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />Promptly after Award of the Contract and within ten days after the effective date of the <br />Agreement, prepare and submit to the Engineer estimated construction progress <br />schedules for the work, with sub-schedules of related activities which are essential to its <br />progress. <br /> <br />B. <br /> <br />Submit revised progress schedules on a monthly basis. <br /> <br />C. <br /> <br />No partial payments shall be approved by the Engineer until there is an approved up to <br />date construction progress schedule on hand. <br /> <br />D. <br /> <br />The Contractor shall designate an authorized representative of his firm who shall be <br />responsible for development and maintenance of the schedule and of progress and <br />payment reports. This representative of the Contractor shall have direct project control <br />and complete authority to act on behalf ofthe Contractor's schedule. <br /> <br />LJ 1.02 RELATED REQUIREMENTS <br /> <br />11 <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />A. <br /> <br />Section 01010: Summary of Work. <br /> <br />B. Section 01152: Applications for Payment <br /> <br />c. <br /> <br />Section 01200: Project Meetings. <br /> <br />D. <br /> <br />Section 01340: Shop Drawings, Working Drawings and Samples. <br /> <br />(-, <br /> <br />1.03 FORM OF SCHEDULES <br /> <br />L,) <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />06/05 <br /> <br />LJ <br /> <br />A. <br /> <br />Prepare schedules for submittal each month with pay request. The form of the schedule <br />is to be Microsoft™ Project 4.1a or approved equal. The Schedule is to indicate work <br />completed to date and additions to or deletions from the schedule. <br /> <br />1. <br /> <br />Provide separate horizontal bar or CPM for each trade or operation within each <br />structure or item. <br /> <br />2. <br /> <br />Horizontal time scale: In weeks from start of construction and identiry the first <br />work day of each month. <br /> <br />3. <br /> <br />Scale and spacing: To allow space for notations and future revisions. <br /> <br />4. <br /> <br />Minimum sheet size: 24 inches x 36 inches. <br /> <br />01310-1 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.