Laserfiche WebLink
<br />n <br /> <br />L.J <br /> <br />fl <br /> <br />u <br /> <br />r <br /> <br />G. <br /> <br />The Contractor shall be responsible for and bear all cost of damages that may result from <br />the ordedng of any material or from proceeding with any part of work prior to the review <br />by Engineer of the necessary Shop Drawings. <br /> <br />L.J 1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />u <br /> <br />,n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />u <br /> <br />'I <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />fl <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />r, <br /> <br />LJ <br /> <br />II <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />06/05 <br /> <br />II <br /> <br />~ <br /> <br />A. <br /> <br />The Engineer's review of drawings, data and samples submitted by the Contractor will <br />cover only general conformity to the Specifications, external connections, and dimensions <br />that affect the installation. The Engineer's review and exceptions if any, will not constitute <br />an approval of dimensions, quantities, and details of the material, equipment, device, or <br />item shown. <br /> <br />B. <br /> <br />The review of drawings and schedules will be general, and shall not be construed: <br /> <br />1. <br /> <br />As permitting any departure from the Contract requirements; <br /> <br />2. <br /> <br />As relieving the Contractor of responsibility for any errors, including details, <br />dimensions, and materials; <br /> <br />3. <br /> <br />As approving departures from details fumishedby the Engineer, except as <br />otherwise provided herein. <br /> <br />C. <br /> <br />If the drawings or schedule as submitted describe variations per subparagraph (l.05.C), <br />and show a departure from the Contract requirements which Engineers finds to be in the <br />interest of the Owner and to be minor as not to involve a change in the Contract Price or <br />time for performance, the Engineer may return the reviewed drawings without noting an <br />exception. <br /> <br />D. <br /> <br />When reviewed by the Engineer, each of the Shop Drawings will be identified as having <br />received such review being so stamped and dated. Shop Drawings stamped "REJECTED" <br />and with required corrections shown will be returned to the Contractor for correction and <br />re-submittal. <br /> <br />E. <br /> <br />Re-submittals will be handled in the same manner as the first submittals. On resubmittals, <br />the Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, <br />to revisions other than the corrections requested by the Engineer on previous submissions. <br />The Contractor shall make any corrections required by the Engineer. <br /> <br />F. <br /> <br />If the Contractor considers any correction indicated on the drawings to constitute a change <br />to the Contract Drawings or Specifications, the Contractor shall give written notice thereof <br />to the Engineer. <br /> <br />G. <br /> <br />The Engineer will review a submittaVresubmittal a maximum of three (3) times after <br />which cost of review will be borne by the Contractor. The cost of engineering shall be <br />equal to the Engineer's charges to the Owner under the terms of the Engineer's agreement <br />with the Owner. <br /> <br />H. <br /> <br />When the Shop Drawings have been completed to the satisfaction of the Engineer, the <br />Contractor shall carry out the construction in accordance therewith and shall make no <br />further changes therein except upon written instructions from the Engineer. <br /> <br />01340-3 <br /> <br />03-4138.8 <br />