Laserfiche WebLink
<br />n <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />~ <br /> <br />II <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />(I <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />r"1 <br /> <br />LJ <br /> <br />,'''I <br /> <br />u <br /> <br />n <br /> <br />\..-1 <br /> <br />n <br /> <br />'--J <br /> <br />(' <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />1.05 <br /> <br />06/05 <br /> <br />I. <br /> <br />No partial submittals will be reviewed. Submittals not complete will be returned to the <br />Contractor, and will not be considered "Rejected" until resubmitted. <br /> <br />SHOP DRAWINGS <br /> <br />A. <br /> <br />When used in the Contract Documents, the term "Shop Drawings" shall be considered to <br />mean Contractor's plans for material and equipment that become an integral part of the <br />Project. These drawings shall be complete and detailed. Shop Drawings shall consist of <br />fabrication, erection and setting drawings and schedule drawings, manufacturer's scale <br />drawings, and wiring and control diagrams. Cuts, catalogs, pamphlets, descriptive <br />literature, and performance and test data, shall be considered only as supportive to <br />required Shop Drawings as defined above. <br /> <br />B. <br /> <br />Drawings and schedules shall be checked and coordinated with work of all trades <br />involved, before they are submitted for review by the Engineer and shall bear the <br />Contractor's stamp of approval as evidence of such checking and coordination. Drawings <br />or schedules submitted without this stamp of approval shall be returned to the Contractor <br />for resubmission. <br /> <br />c. <br /> <br />Each Shop Drawing, shall have a blank area 3 1/2 inches by 3 1/2 inches, located adjacent <br />to the title block. The title block shall display the following: <br /> <br />1. <br /> <br />Number and title ofthe drawing. <br /> <br />2. <br /> <br />Date of drawing or revision. <br /> <br />3. Name of project building or facility. <br /> <br />4. <br /> <br />Name of contractor and subcontractor submitting drawing. <br /> <br />5. <br /> <br />Clear identification of contents and location of work. <br /> <br />6. Specification title and number. <br /> <br />D. <br /> <br />If drawings show variations from Contract requirements because of standard shop practice <br />or for other reasons, the Contractor shall describe such variations in his letter of <br />transmittal. If acceptable, proper adjustment in the Contract shall be implemented where <br />appropriate. If the Contractor fails to describe such variations he shall not be relieved of <br />the responsibility for ex.ecuting the work in accordance with the Contract, even though <br />such drawings have been reviewed. <br /> <br />E. <br /> <br />Data on materials and equipment include, without limitation, materials and equipment <br />lists, catalog data sheets, cuts, performance curves, diagrams, materials of construction and <br />similar descriptive material. Materials and equipment lists shall give, for each item <br />thereon, the name and location of the supplier or manufacturer, trade name, catalog <br />reference, size, finish and all other pertinent data. <br /> <br />01340-4 <br /> <br />03-4138.8 <br />