My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />L.J <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />}I <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />(I <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />r-"""\ <br /> <br />u <br /> <br />}I <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(l <br />LJ <br /> <br />;1\ <br /> <br />L.J <br /> <br />(, <br /> <br />L.J <br /> <br />F. <br /> <br />For all mechanical and electrical equipment furnished, the Contractor shall provide a list <br />including the equipment name, address and telephone number of the manufacturer's <br />representative and service company so that service and spare parts can be readily obtained. <br />In addition, a maintenance and lubrication schedule for each piece of equipment shall be <br />submitted along with each shop drawing submittal. <br /> <br />G. <br /> <br />All manufacturers or equipment suppliers who propose to furnish equipment or products <br />under Divisions 11, 13, 15 and 16 shall submit an installation list to the Engineer along <br />with the required shop drawings. The installation list shall include at least five <br />installations where identical equipment has been installed and has been in operation for a <br />period of at least one (1) year. <br />Only the Engineer will utilize the color "red" in marking Shop Drawing submittals. <br /> <br />H. <br /> <br />I. <br /> <br />Before final payment is made, the Contractor shall furnish to Engineer two (2) sets of <br />record shop drawings all clearly revised, complete and up to date showing the permanent <br />construction as actually made for all reinforcing and structural steel, miscellaneous metals, <br />process and mechanical equipment, yard piping, electrical system, instrumentation system <br />and irrigation. <br /> <br />1.06 WORKING DRAWINGS <br /> <br />A. <br /> <br />When used in the Contract Documents, the term "working drawings" shall be considered <br />to mean the Contractor's plans for temporary structures such as temporary bulkheads, <br />support of open cut excavation, support of utilities, ground water control systems, forming <br />and false-work; for underpinning; and for such other work as may be required for <br />construction, but does not become an integral part of the project. <br /> <br />B. <br /> <br />Copies of working drawings as noted in subparagraph 1.06A above, shall be submitted to <br />the Engineer where required by the Contract Documents or requested by the Engineer, and <br />shall be submitted at least thirty (30) calendar days (unless otherwise specified by the <br />Engineer) in advance of their being required for work. <br /> <br />C. <br /> <br />Working drawings shall be signed by a Registered Professional Engineer, currently <br />licensed to practice in the State of Florida and shall convey, or be accompanied by, <br />calculation or other sufficient information to completely explain the structure, machine, or <br />system described and its intended manner of use. Prior to commencing such work, <br />working drawings must have been reviewed without specific exceptions by the Engineer, <br />which review will be for general conformance and will not relieve the Contractor in any <br />way from his responsibility with regard to the fulfillment of the terms of the Contract. All <br />risks of error are assumed by the Contractor; the Owner and Engineer shall have no <br />responsibility therefore. <br /> <br />1.07 SAMPLES <br /> <br />06/05 <br /> <br />A. <br /> <br />The Contractor shall furnish, for the approval of the Engineer, samples required by the <br />Contract Documents or requested by the Engineer. Samples shall be delivered to the <br />Engineer as specified or directed. The Contractor shall prepay all shipping charges on <br />samples. Materials or equipment for which samples are required shall not be used in work <br />until approved by the Engineer. <br /> <br />01340-5 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.