My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />u <br /> <br />II <br /> <br />LJ <br /> <br />1.05 <br /> <br />(--, <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />disposal of such materials and waste. The Contractor shall also keep its haul roads free <br />from dirt, rubbish, and unnecessary obstructions resulting from its operations. Disposal of <br />all rubbish and surplus materials shall be off the site of construction in accordance with <br />local codes and ordinances governing locations and methods of disposal, and in <br />conformance with all applicable safety laws, and to the particular requirements of Part 1926 <br />of the OSHA Safety and Health Standards for Construction. <br /> <br />C. <br /> <br />Sanitation <br /> <br />1. <br /> <br />Toilet Facilities - Fixed or portable chemical toilets shall be provided wherever <br />needed for the use of employees. Toilets at construction job sites shall conform to <br />the requirements of Part 1926 of the OSHA Standards for Construction. <br /> <br />2. <br /> <br />Sanitary and Other Organic Wastes - The Contractor shall establish a regular daily <br />collection of all sanitary and organic wastes. All wastes and refuse from sanitary <br />facilities provided by the Contractor or organic material wastes from any other <br />source related to the Contractor's operations shall be disposed of away from the site <br />in a manner satisfactory to the Engineer and in accordance with all laws and <br />regulations pertaining thereto. <br /> <br />SALVAGE <br /> <br />A. <br /> <br />Any existing equipment or material including but not limited to, valves, pipes, fittings, <br />couplings, etc., which is removed or replaced as a result of construction under this project <br />may be designated as salvage by the Engineer or City and if so shall be excavated, if <br />necessary, and delivered to the City by a location directed by the City. Any equipment or <br />material not worthy of salvaging, as directed by the City, shall be disposed of by the <br />Contractor at a suitable location. <br /> <br />LJ PART 2 - PRODUCTS (Not Used) <br /> <br />LJ <br /> <br />"PART 3 - EXECUTION <br /> <br />3.01 COOPERATION WITHIN THIS CONTRACT <br /> <br />i' <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />A. <br /> <br />All firms or persons authorized to perform any work under this Contract shall cooperate <br />with the General Contractor and his subcontractors or trades, and shall assist in <br />incorporating the work of other trades where necessary or required. <br /> <br />B. <br /> <br />Cutting and patching, drilling and fitting shall be carried out where required by the trade or <br />subcontractor having jurisdiction, unless otherwise indicated herein or directed by the <br />Engineer. <br /> <br />n <br /> <br />3.02 PROTECTION OF CONSTRUCTION AND EQUIPMENT <br /> <br />L.J <br /> <br />A. <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />06/05 <br /> <br />n <br /> <br />l...J <br /> <br />All newly constructed work shall be carefully protected from IDJury in any way. No <br />wheeling or walking or placing of heavy loads on it shall be allowed and all portions <br />injured shall be reconstructed by the Contractor at his own expense. <br /> <br />END OF SECTION <br /> <br />01505-3 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.