Laserfiche WebLink
<br />" <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />SECTION 01510 <br /> <br />TEMPORARY UTILITIES <br /> <br />LJ PART I-GENERAL <br /> <br />n <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />A. <br /> <br />Furnish, install and maintain temporary utilities required for construction, remove on <br />completion of work. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />n <br /> <br />LJ <br /> <br />A. <br /> <br />Section 01010: Summary of Work <br /> <br />u <br /> <br />n 1.03 REQUIREMENTS OF REGULATORY AGENCIES <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />A. <br /> <br />Comply with National Electric Code. <br /> <br />B. <br /> <br />Comply with Federal, State and Local codes and regulations and with utility company <br />requirements. <br /> <br />C. <br /> <br />Comply with County Health Department and Environmental Regulations. <br /> <br />PART 2 - PRODUCTS <br /> <br />II <br /> <br />fl <br /> <br />LJ 2.01 MATERIALS <br /> <br />LJ <br /> <br />n <br /> <br />A. <br /> <br />Materials may be new or used, but must be adequate in capacity for the required usage, <br />must not create unsafe conditions, and must not violate requirements of applicable codes <br />and standards. <br /> <br />LJ 2.02 TEMPORARY ELECTRICITY AND LIGHTING <br /> <br />(, <br /> <br />LJ <br /> <br />n <br /> <br />Li <br /> <br />n <br /> <br />LJ <br /> <br />C. <br /> <br />n <br /> <br />u <br /> <br />I' <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />06/05 <br /> <br />(" <br /> <br />u <br /> <br />A. <br /> <br />Arrange with utility company, provide service required for power and lighting, and pay <br />all costs for service and for power used in the construction, testing and trial operation <br />prior to final acceptance of the work by the Owner. <br /> <br />B. <br /> <br />Install circuit and branch wiring, with the area distribution boxes located so that power <br />and lighting is available throughout the construction by the use of construction type <br />power cords. <br /> <br />Provide adequate artificial lighting for all areas of work when natural light IS not <br />adequate to work, and all areas accessible to the public. <br /> <br />01510-1 <br /> <br />03-4138.8 <br />