My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />u <br /> <br />n <br /> <br />DOCUMENT 01720 <br /> <br />u <br /> <br />n <br /> <br />PROJECT RECORD DOCUMENTS <br /> <br />L.J <br /> <br />PART 1 - GENERAL <br /> <br />II <br /> <br />1.01 REQUIREMENTS INCLUDED <br /> <br />L.J <br /> <br />A. Maintain at the site for the Owner one record copy of: <br /> <br />II <br /> <br />LJ <br /> <br />1. <br /> <br />Drawings <br /> <br />n <br /> <br />2. <br /> <br />Specifications <br /> <br />u <br /> <br />3. Addenda <br /> <br />n <br /> <br />4. <br /> <br />Change Orders and other Modifications to the Contract <br /> <br />LJ <br /> <br />II <br /> <br />5. <br /> <br />Engineer's Field Orders or Written Instructions <br /> <br />u <br /> <br />6. <br /> <br />Approved Shop Drawings, Working Drawings, and Samples <br /> <br />n <br /> <br />7. <br /> <br />Field Test Reports <br /> <br />LJ <br /> <br />8. Construction Photographs <br /> <br />II <br /> <br />L.J 1.02 RELATED REQUIREMENTS <br /> <br />n <br /> <br />A. <br /> <br />Section 01340: Shop Drawings, W{)rking Drawings, and Samples <br /> <br />L.J <br /> <br />B. Section 01050: Field Engineering <br /> <br />n <br /> <br />C. <br /> <br />Section 01701: Project Closeout <br /> <br />L.J <br /> <br />" <br /> <br />1.03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br /> <br />L.J <br /> <br />A. <br /> <br />Store documents and samples in Contractor's field office apart from documents used for <br />construction. <br /> <br />" <br /> <br />LJ <br /> <br />B. <br /> <br />File documents and samples in accordance with CSI format number system. <br /> <br />fl <br /> <br />c. <br /> <br />Maintain documents in a clean, dry, legible condition and in good order. Do not use <br />record documents for construction purposes. <br /> <br />u <br /> <br />n <br /> <br />D. <br /> <br />Make documents and samples available at all times for inspection by the Engineer. <br /> <br />u <br /> <br />E. <br /> <br />As a prerequisite for monthly progress payments, the Contractor is to exhibit the <br />currently updated "record documents" for review by the Engineer and the Owner. <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />" <br /> <br />06/05 <br /> <br />01720-1 <br /> <br />03-4138.8 <br /> <br />L.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.