Laserfiche WebLink
<br />fl <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />fl <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />fl <br /> <br />u <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />fl <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />L.J <br /> <br />1.04 RECORDING <br /> <br />1.05 <br /> <br />06/05 <br /> <br />A. <br /> <br />B. <br /> <br />C. <br /> <br />Label each document "PROJECT RECORD" in neat large printed letters. <br /> <br />Record information concurrently with construction progress. <br /> <br />Drawings; Legibly mark record actual construction: <br /> <br />1. Depths of various elements of foundation in relation to finish grade elevations. <br /> <br />2. <br /> <br />All underground piping with elevations and dimensions. Changes to piping <br />location. Actual installed pipe material, class, etc. <br /> <br />3. <br /> <br />Location of internal utilities and appurtenances concealed in the construction, <br />referenced'to visible and accessible features of the structure. <br /> <br />4. Field changes of dimensions and details. <br /> <br />5. <br /> <br />Changes made by Field Order or by Change Order. <br /> <br />6. <br /> <br />Details not on original contract drawings. <br /> <br />7. <br /> <br />Equipment and piping relocations. <br /> <br />D. Specifications and Addenda; legibly mark each Section to record: <br /> <br />1. <br /> <br />Manufacturer, trade name, catalog number and supplier of each product and item <br />of equipment actually installed. <br /> <br />2. <br /> <br />Changes made by field order or by Change Order. <br /> <br />E. <br /> <br />Shop Drawings (after final review and approval): <br /> <br />1. <br /> <br />One set of record shop drawings for each process equipment, piping, (including <br />casings) electrical system and instrumentation system. <br /> <br />SUBMITTAL <br /> <br />A. <br /> <br />At Close-out, deliver Record Documents to the Engineer for the Owner. <br /> <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br /> <br />1. <br /> <br />Date <br /> <br />2. <br /> <br />Project Title and Number <br /> <br />3. Contractor's Name and Address <br /> <br />4. <br /> <br />Title and Number of each Record Document <br /> <br />5. <br /> <br />Signature of Contractor or his Authorized Representative <br /> <br />01720-2 <br /> <br />03-4138.8 <br />