Laserfiche WebLink
<br />" <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />Li <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />fl <br /> <br />u <br /> <br />n <br /> <br />L.J <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />f' <br /> <br />L.J <br /> <br />3.05 PRESERVATION OF TREES <br /> <br />06/05 <br /> <br />A. <br /> <br />The Contractor shall erect such barricades, guards, and enclosures as may be considered <br />necessary by him for the protection of all trees during all construction operations. Refer to <br />Section 01532-2 for specifications. <br /> <br />B. <br /> <br />Paint, oil solvents, asphalt, concrete, mortar, and other tree contaminants shall not be used <br />or stored within the tree dripline. <br /> <br />C. <br /> <br />All tree trimming to facilitate construction shall be performed to the National Arborist <br />Association (NAA) standards by a certified tree company. <br /> <br />D. <br /> <br />Any tree that is destructively damaged, destroyed, or cut down as a result of this <br />construction shall be replaced at an inch to inch diameter. The minimum tree replacement <br />shall be a two-inch diameter and ten foot high Florida Grade # 1 or better tree. The <br />Department of Development Administration shall be consulted as to the type of tree. <br /> <br />E. <br /> <br />The Contractor shall exercise all necessary precautions so as not to damage or destroy any <br />trees or shrubs, including those lying within street rights-of-way and project limits, and <br />shall not trim or remove any trees unless such trees have been approved for trimming or <br />removal by the jurisdictional agency or City. The Contractor shall notify the jurisdictional <br />agency and/or the City if any tree is damaged by the Contractor's operations. If, in the <br />opinion of said agency or the City, the damage is such that replacement is necessary, the <br />Contractor shall replace the tree at his own expense as directed by the City. <br /> <br />END OF SECTION <br /> <br />02100-2 <br /> <br />03-4138.8 <br />