Laserfiche WebLink
<br />I' <br /> <br />LJ <br /> <br />(I <br /> <br />u <br /> <br />r---. <br /> <br />LJ <br /> <br />r---. <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />r---. <br /> <br />L.J <br /> <br />II <br /> <br />LJ <br /> <br />(, <br /> <br />u <br /> <br />SECTION 02210 <br /> <br />PART 1 GENERAL <br /> <br />FINE GRADING <br /> <br />1.01 SCOPE OF WORK <br /> <br />A. <br /> <br />Provide all labor, materials, necessary equipment or services to complete the Fine <br />Grading work, as indicated on the drawings, as specified herein or both, except as for <br />items specifically indicated as "NIC ITEMS". <br /> <br />1.02 RELATED WORK <br /> <br />A <br /> <br />Section 02481 - Shrub and Tree Relocation <br /> <br />B. <br /> <br />Section 02484 - Soil Preparation and Soil Mixes <br /> <br />C. <br /> <br />Section 02487 - Sodding <br /> <br />D. <br /> <br />Section 02490 - Trees, Plants, and Groundcovers <br /> <br />n 1.03 SITE INSPECTION <br /> <br />u <br /> <br />II <br /> <br />u <br /> <br />I' <br /> <br />LJ <br /> <br />" <br /> <br />'-..; <br /> <br />n <br /> <br />LJ <br /> <br />r---. <br /> <br />LJ <br /> <br />r, <br /> <br />L-J <br /> <br />r, <br /> <br />u <br /> <br />r', <br /> <br />u <br /> <br />(', <br /> <br />u <br /> <br />(I <br /> <br />LJ <br /> <br />A. <br /> <br />The Contractor shall visit the site and acquaint himself with all existing conditions. The <br />Contractor shall be responsible for his own subsurface investigations, as necessary, to <br />satisfy requirements of this Section. All subsurface investigations shall be performed <br />only under time schedules and arrangements approved in advance by the Landscape <br />Architect or Owner's Representative. <br /> <br />1.04 EXISTING CONTOURS <br /> <br />A. <br /> <br />The existing grades shown on the drawings are approximate only (within i: 2 inches) and <br />the contractor is responsible for grading to meet existing grades as required. <br /> <br />B. <br /> <br />The contours and grades established under contract will be the finished grades shown. <br />The Contractor under this Contract shall perform the work for construction using the <br />finished grades previously established and making whatever corrections and/or repairs to <br />grades to make them consistent with the requirements of the drawings and specifications. <br /> <br />c. <br /> <br />Established finished grades shall be approved by the Landscape Architect for all project <br />areas prior to initiating landscape planting. <br /> <br />1.05 UTILITIES <br /> <br />06/05 <br /> <br />A. <br /> <br />Before starting site operations verify that the earlier contractors have disconnected all <br />temporary utilities that might interfere with the fine grading work. <br /> <br />B. <br /> <br />Locate all existing, active utility lines traversing the site and determine the requirements <br />for their protection. Preserve in operating condition all active utilities adjacent to or <br />transversing the site that are designated to remain. <br /> <br />02210-1 <br /> <br />03-4138.8 <br />