My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-844
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:28:43 AM
Creation date
1/25/2006 1:58:00 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-844
Date (mm/dd/yyyy)
10/11/2005
Description
– Agmt w/R & S Integrated Products & Srvs. Document Imaging (Laserfiche).
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The School District of Lee County, Florida - RFP # 6211 <br />Document Imaging System <br /> <br />August 5, 2004 <br /> <br />Part Three - Low Volume Production TestinQ <br />After daily production methods have been established and users have been trained, the DIMS will be <br />tested in low-volume production mode, uSing an established test checklist <br /> <br />Part Four - Full Production TestinQ <br />Production APIS testing will Involve the following <br />· Performance testing for scanning quality and time <br />. Network monitoring for speed and throughput <br />. Monitoring of scanning process for productivity and quality <br />· Response time for word and index searches <br />· Electronic document import and searching <br />· Simultaneous searching by multiple users <br />· Edits of system configuration <br />· Data volume migration <br />· BasIc security setup, test various user setups and access <br />· Basic scanning and Indexing <br /> <br />During production testing, users in various departments should be retrieving records and using the DIMS <br />as anticipated In a tYPical workday The test event will run all scanners at the rated speed for a <br />reasonable period of time, The test event will verify the document capture production throughput, <br />document search and retrieval, and print limes while all stations are active and the scanners are running <br />at production levels, <br /> <br />Part Five - Final DIMS Testing in Production Mode <br /> <br />Part Six - Final DIMS Solution Testing - Full Solution - Project Solution Acceptance Testing <br /> <br />Part Seven - Totai system and work process support Fine tuning of process, capture parameters, user <br />parameters and permissions, etc <br /> <br />R&S Integrated Products and Services, Inc. <br /> <br />Page 28 <br /> <br />::."~~ S ~~; <br />.' <br />:;.~ ~ r~ <br />:.......J t ,to... <br />
The URL can be used to link to this page
Your browser does not support the video tag.