My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-852
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:33:14 AM
Creation date
1/25/2006 1:58:01 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-852
Date (mm/dd/yyyy)
11/17/2005
Description
– Agmt w/Calvin Giordano re: 181st Dr. Active Park Construction Mgmt.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No.60 <br />August 31, 2005 <br />Calvin, Giordano & Associates, Inc. Proposal No. 05-5388 <br /> <br />CITY OF SUNNY ISLES BEACH <br />181 sf Drive Active Park - Inspection Services <br /> <br />PROJECT DESCRIPTION: <br /> <br />Inspection services for the construction of the 181 st Drive Active Park in the City of Sunny Isles <br />Beach. <br /> <br />1. SCOPE OF SERVICES <br /> <br />The services below have been estimated for up to 195 hours, anything above that will require <br />additional agreements. <br /> <br />Contract Administration Services: <br /> <br />A. Meeting with Contractor and appropriate regulatory agencies when requested and <br />necessary for consultation or conferences in regard to construction of the project. <br />B. Issue interpretations and clarifications of the Contract Documents, and evaluate requested <br />deviations from the approved design or specification. In connection therewith, review, <br />prepare and process any work change directives or change orders requested by the <br />Contractor or City. <br />C. Review shop drawings, samples and other data which the Contractor is required to submit, <br />but only for conformance with the design concept of the project and compliance with the <br />specifications. <br />D. Review, approve and process pay request. <br />E. Make daily inspections for compliance with plans and specifications, Make interim <br />inspections for substantial completion; approve pay requests and perform a final <br />inspection to determine if the work has been completed in reasonable conformance with <br />the intent of the Contract Documents. <br />F. Review as-buiIts provided by the Contractor. <br /> <br />Inspection Services: <br /> <br />A. Monitor construction of the work and verify the construction IS within reasonable <br />conformance with the intent of the Contract Documents. <br />B. Provide inspection reports to the Owner and regulatory agencies, as required. <br />C. Regular inspections of the site to ensure schedules are followed and City standards are met <br />(up to 750 hours of inspection time). <br />D. Verify that pay request quantities match the work performed and Contact Documents. <br /> <br />P:\Proposals\2005 Proposals\05-5388 181st Dr. Active Park - Insp. Services.doc <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.