My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-927A
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-927A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:41 AM
Creation date
7/25/2006 3:56:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-927A
Date (mm/dd/yyyy)
06/15/2006
Description
CALVIN GIORDANO & ASSOC - Town Center Park Restroom & Lighting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I, <br /> <br />Work Authorization No. 258 <br />April I 1,2006 <br />Calvin, Giordano & Associates, Inc. Proposal No. 06-5723 <br /> <br />CITY OF SUNNY ISLED BEACH <br />Town Center Park Restroom and LightiD!! Improvements <br /> <br />PROJECT DESCRIPTION: <br /> <br />1. SCOPE OF SERVICES <br /> <br />I. Professional Land Surveying Services <br /> <br />A. Design Survey <br /> <br />Determine existing upland elevations within the project area. Locate existing, <br />structures, fencing, trees and other physical features as specified by the <br />engineer. Prepare CADD base file with all information relevant to engineering <br />design. <br /> <br />II. Professional Electrical Engineering Services <br /> <br />A. Design Phase <br /> <br />Prepare electrical engineering design for the restroom, additional lighting <br />around pedestrian walkway (center of park), and a electrical pull box for the <br />future pedestrian wooden dock and observation platform. Provide plans and <br />specifications for competitive bidding, permitting, photometrics, and <br />construction including shop drawing review and two inspections. <br /> <br />III. Professional Civil Engineering Services <br /> <br />A. Preliminary Investigation <br /> <br />Visit and inspect site to determine existing conditions. Take photos, make <br />written documentation, sketches, notes and research specific codes, regulations <br />and requirements. Collect all existing as-builts. Attend one (1) meeting with <br />the City to discuss restroom and lighting layout. Coordinate with all <br />governmental agencies that have jurisdiction over the site. <br /> <br />B. Preliminary Design <br /> <br />Prepare a preliminary layout of the proposl~d restroom for presentation to the <br />City. Attend one (1) meeting to go over the City's comments. Revise the <br />preliminary plans per the City's comments. <br /> <br />C. Design Phase <br /> <br />Prepare proposed engineering design for the restroom while taking into account <br />location of jurisdictional wetland limits, existing sidewalks, trees, structures <br />and existing grades. <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.