My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-927A
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-927A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:41 AM
Creation date
7/25/2006 3:56:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-927A
Date (mm/dd/yyyy)
06/15/2006
Description
CALVIN GIORDANO & ASSOC - Town Center Park Restroom & Lighting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No. 258 <br />April II, 2006 <br />Calvin, Giordano & Associates, Inc. Proposal No. 06-5723 <br /> <br />D. Final Civil Engineering Services <br /> <br />Prepare construction drawings and specifications including, grading and <br />drainage plans in accordance with all applicable codes. Secure all necessary <br />approvals for construction of the project with Miami-Dade Public Works, <br />FDOT, Miami-Dade County Department of Environmental Resource <br />Management, Miami-Dade County Water and Sewer Department and the City <br />of Sunny Isles Beach. Provide engineering drawings at time of technical <br />compliance. During bidding phases, any Requests for Information (RFI's) shall <br />be responded to, bids shall be opened, tabulated and recommendations shall be <br />made. <br /> <br />IV. Construction Phase Services <br /> <br />A. Shop Drawing review and approval. <br />B. As-built Drawing review and approval. <br />C. Final Certification and Closeout. <br />D. Pay Request review and approval. <br />E. Attend the pre-bid and monthly meetings. <br />F. Conduct periodic construction engineering inspections <br /> <br />2. BASIS OF COMPENSATION: <br /> <br />Hourly rates with an estimated fee of $24,640.00 plus reimbursables at $1,232.00 with a total <br />not to exceed amount of$25,872.00. Payments to be made monthly. <br /> <br />3. TIME OF PERFORMANCE: <br /> <br />Items I through IV under the Scope of Services will be completed within 180 calendar days <br />after the Notice to Proceed except for delays beyond the control of the Consultant. <br /> <br />4. <br /> <br />SUBMITTED: <br /> <br />l~ <br /> <br />Calvin, Giordano & Associates, Inc. <br /> <br />Date: H. -( ') /0 {. <br /> <br />Submitted by: <br /> <br />5. APPROVAL: <br /> <br />Approved by: <br /> <br />Date: <br /> <br />John Szerlag <br />City Manager <br /> <br />S/8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.