Laserfiche WebLink
<br />1~-1~-'~~ IJ;~~ fHUM-nuttlng engIneers <br /> <br />~~~1)~q1)1)[( <br /> <br />l-q~q r~~~/~~q ~-J~b <br /> <br />FEE SCHEDULE - TEST PILE INSTALLATION AND LOAD TEST <br /> <br />We understand that one compression and one tension load ~t Will be ~rformed as part of the <br />project. This will be performed for an estimated cost o~ $6,475.00 ~ased on the following <br />quantities and unit rates. <br /> <br />Engineering Services 30 @ $80.00 hr $2400.00 <br />Test Pile Installation Monitoring <br />Set Up Pile Load Test, LoadlUnload Pile <br />Load Test Report and Installation Criteria 8 @ $80.00 hr $640.00 <br />T echnician/Inspector 35 @ $50.00 hr $1750.00 <br />Monitor Pile Load Test <br />Technician Overtime 25 @ $65.00 hr $1625.00 <br />Grout Cubes - Cast, test, and report 1 @ $60.00 set $60.00 <br /> <br />FEE SCHEDULE - PRODUCTION PILE INSTALLATION MONITORING <br /> <br />The production pile installation monitoring will be performed for an estimated cost of $5,260.00 <br />based on the following unit rates and quantities: <br /> <br />T echnician/Inspector <br />Project ManagementIReport <br />Grout Cubes <br /> <br />80 @ $50.00 hr <br />12 @ $80.00 hr <br />5 @ $60.00 set <br /> <br />$4000.00 <br />$960.00 <br />$300.00 <br /> <br />The above fee schedules are provided to give an estimate of the costs associated with the <br />monitoring/reporting of the installation of the production piles. The actual costs will be based on <br />the time required to install the piles, behavior of the pile load test, and other factors beyond ow: <br />control. <br /> <br />Thank you for providing us the opportunitY to present this proposal. We look forward to <br />working with you on this project. <br /> <br />Sincerely, <br />NUTTING ENGINEERS OF FLORIDA, INC- <br /> <br />Catalin Berindean <br />Geotechnical Engineer <br /> <br />Richard R. Wohlf(Uth, P.E.# 50858 <br />Director of Engineering <br />