My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-885
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:41 AM
Creation date
7/26/2006 4:49:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-885
Date (mm/dd/yyyy)
02/16/2006
Description
Change Order #1 SILTEK GROUP - Active Park Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1~-1~-'~~ IJ;~~ fHUM-nuttlng engIneers <br /> <br />~~~1)~q1)1)[( <br /> <br />l-q~q r~~~/~~q ~-J~b <br /> <br />FEE SCHEDULE - TEST PILE INSTALLATION AND LOAD TEST <br /> <br />We understand that one compression and one tension load ~t Will be ~rformed as part of the <br />project. This will be performed for an estimated cost o~ $6,475.00 ~ased on the following <br />quantities and unit rates. <br /> <br />Engineering Services 30 @ $80.00 hr $2400.00 <br />Test Pile Installation Monitoring <br />Set Up Pile Load Test, LoadlUnload Pile <br />Load Test Report and Installation Criteria 8 @ $80.00 hr $640.00 <br />T echnician/Inspector 35 @ $50.00 hr $1750.00 <br />Monitor Pile Load Test <br />Technician Overtime 25 @ $65.00 hr $1625.00 <br />Grout Cubes - Cast, test, and report 1 @ $60.00 set $60.00 <br /> <br />FEE SCHEDULE - PRODUCTION PILE INSTALLATION MONITORING <br /> <br />The production pile installation monitoring will be performed for an estimated cost of $5,260.00 <br />based on the following unit rates and quantities: <br /> <br />T echnician/Inspector <br />Project ManagementIReport <br />Grout Cubes <br /> <br />80 @ $50.00 hr <br />12 @ $80.00 hr <br />5 @ $60.00 set <br /> <br />$4000.00 <br />$960.00 <br />$300.00 <br /> <br />The above fee schedules are provided to give an estimate of the costs associated with the <br />monitoring/reporting of the installation of the production piles. The actual costs will be based on <br />the time required to install the piles, behavior of the pile load test, and other factors beyond ow: <br />control. <br /> <br />Thank you for providing us the opportunitY to present this proposal. We look forward to <br />working with you on this project. <br /> <br />Sincerely, <br />NUTTING ENGINEERS OF FLORIDA, INC- <br /> <br />Catalin Berindean <br />Geotechnical Engineer <br /> <br />Richard R. Wohlf(Uth, P.E.# 50858 <br />Director of Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.