My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-885
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:41 AM
Creation date
7/26/2006 4:49:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-885
Date (mm/dd/yyyy)
02/16/2006
Description
Change Order #1 SILTEK GROUP - Active Park Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12-13-'05 17:38 FROM-nutting engIneers <br /> <br />3058248827 <br /> <br />T-404 P002/004 F-756 <br /> <br />December, 2005 <br /> <br />Mrs. Susan Simmons <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Swmy Isles Beach., Florida 33160 <br /> <br />Tel: 305.792-1706 <br /> <br />Fax: 305-792-1566 <br /> <br />Subject: <br /> <br />Proposal for Pile Load Test and <br />Pile Installation Monitoring <br />Proposed Gymnasium at 2- Acre Park <br />181 st Drive and North Bay Road <br />Sunny Isles Beach, Florida <br /> <br />Dear Mrs. Simmons: <br /> <br />Nutting Engineers of Florida, Inc. is pleased to present this proposal for performing augercast <br />pile load test and installation monitoring for the Proposed Gymnasium and Recreational Park <br />project in Sunny Isles Beach; Florida <br /> <br />We understand that approximately 205 augercast piles will be installed for this project. We <br />understand that a pile load test will be performed in accordance with the South Florida Building <br />Code to twice the design load. Nutting Engineers previously performed a geotechnical <br />exploration for this project, and our findings and recommendations are presented in a report <br />dated June 16,2004" <br /> <br />Based on our understanding of the project, we propose the following scope of work and fee <br />schedule. <br /> <br />SCOPE OF WORK <br /> <br />We will provide full-time monitoring of the installation of the test/reaction piles and production <br />augercast piles, provide instnunentation and direct the pile load test. Based on the results of the <br />pile load test, we will provide final installation criteria for the production piles. A log of each <br />pile will be kept and will include depth, size, grout take, steel reinforcement placed, and other <br />pertinent information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.