Laserfiche WebLink
<br />,JAI'I-'4-~UUb I U: 42 <br /> <br />FROM-SE MECHANICAL CONTRACTORS LTD <br /> <br />954 987 4490 <br /> <br />8. APPENDIX B - EQUIPMENT TASKING PROCEDURES <br /> <br />PUMPS - ANNUAL MAINTENANCE INSPECTION <br /> <br />1. Lube pump bearings <br />2. Lube motor bearings <br />3. Inspect mounts and vibration pads <br />4. Inspect pump alignment and coupling <br />5. Inspect motor volts/amps <br />6. Check and tighten all electrical connections <br />7. Inspect and clean strainers <br />8. Inspect hand valves and Inspect valves <br />9. Inspect mechanical seals where applicable <br />10. Inspect packing where applicable <br />11. Verify gauges for accuracy <br />12. Inspect suction and discharge pressures <br />13. Clean external surfaces <br />14. Visual Inspect for leaks <br /> <br />PUMPS - OPERATIONAL MAThTTENANCE INSPECTION <br /> <br />1. Lube pump bearings <br />2. Lube motor bearings <br />3. Inspect mounts and vibration pads <br />4. Inspect pump alignment and coupling <br />5. Inspect motor volts/amps <br />6. Check and tighten all electrical connections <br />7. Inspect strainers <br />8. Inspect mechanical seals where applicable <br />9. Inspect packing where applicable <br />10. Verify gauges for accuracy <br />11. Inspect suction and discharge pressures <br />12. Clean external surfaces <br />13. Visual Inspect for leaks <br /> <br />Programmed Maintenance Agreement <br /> <br />01/24/06 <br /> <br />T-616 P.015/020 F-B30 <br /> <br />Page 14 of 19 <br /> <br />SIB <br />