My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-900
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:46 AM
Creation date
8/2/2006 4:09:48 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-900
Date (mm/dd/yyyy)
03/16/2006
Description
SOUTHEAST MECHANICAL CONTRACTORS - HVAC Equipment Maintenance Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,J~n-'4~'UUb IU:4~ <br /> <br />rI<UM-~~ M~r.;HANIr.;AL CONTRACTORS L[D <br /> <br />954 987 4490 <br /> <br />T-616 P,OlS/020 F-B30 <br /> <br />AIR COOLED CIDLLER SCREW UNIT - ANNUAL MAINTENANCE INSPECTION <br /> <br />1. Record unit running hours <br />2. Verify and check all electrical connections <br />3. Verify and check aU electrical controls <br />4. Check compressor oil level <br />5. Inspect water pressure drop across chiller <br />6. Inspect pressure drop across oil mter <br />7. Visual leak check refrigerant and oil <br />8. Record refrigerant temperatures <br />9. Record refrigerant pressures <br />10. Record evaporator approaches <br />11. Inspect mechanical/electrical interlocks <br />12. Record condenser pressure <br />13. Record evaporator pressure <br />14. List unusual noises/vibrations <br />15. Inspect structural integrity of unit <br />16. Check all condenser fan motors <br /> <br />AIR COOLED CHILLER SCREW UNIT - OPERATIONAL MAINTENANCE INSPECTJrON <br /> <br />1. Record unit running hours <br />2. Verify and check all electrical connections <br />3. Verify and check all electrical controls <br />4. Check compressor oil level <br />S. Inspect water pressure drop across chiller <br />6. Inspect pressure drop across oil filter <br />7. Visual leak check refrigerant and oil <br />8. Check refrigerant temperatures <br />9. Check refrigerant pressures <br />10. Inspect mechanicaI/electrical interlocks <br />11. List unusual noises/vibrations <br />12. Inspect structural integrity of unit <br />13. Check all condenser fan motors <br /> <br />Programmed Maintenance Agreement <br /> <br />01/24/06 <br /> <br />Page 1 5 of 19 <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.