Laserfiche WebLink
<br />EXHIBIT "A" <br /> <br />2. The CITY agrees to allow DEVELOPER, to the extent the CITY has authority to <br /> <br />do so, to install the improvements in the easement and/or right-of-way as noted above. Further, <br /> <br />the CITY will allow DEVELOPER to tie the improvements into the existing line, and within six <br /> <br />months of completion, the CITY will provide an adequate water supply as defined in the <br /> <br />Metropolitan Miami-Dade County Code to service the Building. DEVELOPER, agrees that the <br /> <br />cost and expense of construction of all consumers' installations, including but not limited to <br /> <br />appliances, pipes, valves, fixtures, shut-offs, or apparatus of every kind and nature used in <br /> <br />connection with or forming a part of an installation for utilizing water services and extending <br /> <br />from the CITY's water mains in a public place or easement or reserved strip or on <br /> <br />DEVELOPER's property shall be that of the DEVELOPER. In addition, the CITY agrees to <br /> <br />assist DEVELOPER in any way possible to obtain such governmental approvals as may be <br /> <br />necessary to construct the improvements so long as there is no cost to the CITY, and to allow <br /> <br />DEVELOPER to use such utility easements as the CITY controls to install the improvements. <br /> <br />3. DEVELOPER agrees to pay for engineering costs and all costs of installing the <br /> <br />improvement. The consent of the CITY to the installation of said line is expressly contingent <br /> <br />upon the CITY not incurring any expenditures for same other than routine administrative costs <br /> <br />and subsequent costs of maintenance. <br /> <br />4. DEVELOPER agrees to convey to the CITY at no charge and the CITY agrees to <br /> <br />accept the improvements when completed and tested, provided said improvement is constructed <br /> <br />in compliance with the approved plans and to the utility's standards and has passed a final <br /> <br />inspection by utility personnel. In addition, the following documents are to be submitted to and <br /> <br />accepted by the Public Services Department. <br /> <br />/Fireflow\Active Park <br /> <br />3 Ini tial: <br />D.ev~lope : <br />CIty: ~ <br />~ SIB <br /> <br />Jan 172006 <br />