My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-895
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:51 AM
Creation date
8/15/2006 12:31:28 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-895
Date (mm/dd/yyyy)
02/16/2006
Description
FIREFLOW AGREEMENT between SIB and City of North Miami Beach
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT "A" <br /> <br />1) As-Built drawings, one (1) mylar transparency and one (1) print certified <br /> <br />and signed by contractor and engineer of record and meeting the as-built <br /> <br />drawing standard of the utility. <br /> <br />2) Contractor's Waiver and Release of Lien. <br /> <br />3) Easement Agreement, if required. <br /> <br />4) Absolute Bill of Sale. <br /> <br />5) Developer's Letter of Warranty (one year) <br /> <br />6) Engineer's Certificate of Completion (DERM) <br /> <br />All documents listed above are to be submitted in a form acceptable to the CITY. Sample <br /> <br />documents of an acceptable form are available from the Public Services Department. If the <br /> <br />above requirements are not fully and completely complied with, the CITY retains the right to <br /> <br />withhold any and all water service or connections to be provided to the improvement or to <br /> <br />disconnect any temporary water service until written acceptance of the improvement is issued by <br /> <br />the CITY. <br /> <br />Any water service which may be provided as an accommodation to DEVELOPER prior <br /> <br />to final acceptance of the. Improvement is to be considered temporary and subject to <br /> <br />disconnection at any time prior to such final acceptance. <br /> <br />After completion and acceptance by the CITY, the improvements shall remain the sole <br /> <br />and exclusive property of the CITY, which entity will have the obligation to maintain same so <br /> <br />long as the CITY operates the existing water system. <br /> <br />/Fireflow\Active Park <br /> <br />4 <br /> <br />Initial: <br /> <br />Jan 172006 <br /> <br />D~ <br />CIty: <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.