My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-983
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:53 AM
Creation date
1/3/2007 2:45:23 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-983
Date (mm/dd/yyyy)
09/21/2006
Description
Agmt w/ CGA, HYDROGEOLOGICAL INVESTIGATION of CENTRAL ISLAND DRAINAGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No. 85 <br />September 11,2006 <br />Calvin, Giordano & Associates, Inc. Proposal No. 03-4122.4 <br /> <br />A water truck will be supplied, which will be used to store temporarily the groundwater <br />pumped from the test hole. The groundwater will be returned to the hole when testing is <br />completed. The drill cuttings will be disposed of off site. <br /> <br />Task 2 can be completed in six days (two days per test hole). Laboratory results will be <br />available within one week after sample delivery. <br /> <br />Task 3 - Report Preparation <br /> <br />A report will be prepared that documents evaluation and opinion of the data to be submitted to <br />FDEP as part of the permitting package. The report will be signed and sealed by a State of <br />Florida Licensed Professional Geologist. If the data does not provide reasonable assurance of <br />minimal impact, additional evaluation may be recommended, e.g., test wellslborings, <br />groundwater modeling, the Client will be so advised. <br /> <br />Preparation of the report will include researching nearby USGS well information and other <br />geologic data, and researching test boring and total dissolved solids data from nearby project <br />sites. <br /> <br />A separate letter will be prepared that documents the specific capacity tests and provides <br />professional opinion on the specific capacity of each test hole. <br /> <br />2. <br /> <br />BASIS OF COMPENSATION: <br /> <br />Hourly rates with an estimated fee of $56,896.00 plus reimbursables at $2,844.80 with a total <br />not to exceed amount of $59,740.80. Payments to be made monthly. <br /> <br />3. TIME OF PERFORMANCE: <br /> <br />Tasks 1 through 3 under the Scope of Services will be completed within 45 calendar days after <br />the Notice to Proceed except for delays beyond the control of the Consultant. <br /> <br />4. SUBMITTED: <br /> <br />Submitted by: 0^..u.,~ Cd'V~ <br />" Calvin, Gi rdano & Associates, Inc. <br /> <br />Date: '1/ (I/Oh <br /> <br />5. APPROVAL: <br /> <br />Approved by: <br /> <br />Date: <br /> <br />John Szerlag <br />City Manager <br /> <br />P:\Proposals\2003 Additional Services\03-4122.4 SIB Hydrogeological Investigation.doc <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.