Laserfiche WebLink
<br />Work Authorization No. 85 <br />September II, 2006 <br />Calvin, Giordano & Associates, Inc. Proposal No. 034122.4 <br /> <br />CITY OF SUNNY ISLES BEACH <br />WORK AUTHORIZATION ESTIMATE SEPTEMBER 11, 2006 <br /> <br />WORK AUTHORIZATION NO. <br />PROJECT NAME <br /> <br />#85 <br />Central Island Drainage and Street Improvements - Hydrogeological <br />Investigation <br />CGA Proposal No. 03-4122.4 <br /> <br />The scope of work is required to provide a reasonable assurance <br />investigation as well as determining the flow rates and capacity ofthe <br />proposed wells prior to the installation of the proposed drainage <br />system. <br /> <br />DESCRIPTION <br /> <br />GEOTECHNICAL ANALYSIS - LANGAN <br />LAHORA TORY TESTING <br />TRAFFIC CONTROL <br />WELL DRILLING <br /> <br />$18,600.00 <br />$690.00 <br />$8,798.00 <br />$28,808.00 <br /> <br />LABOR SUBTOTAL <br />REIMBURSABLE SUBTOTAL <br />TOTAL <br /> <br />$56,896.00 <br />$2,844.80 <br />$59,740.80 <br /> <br />Reviewed By: <br /> <br />John Szerlag, City Manager <br /> <br />P:\Proposals\2003 Additional Services\03-4122.4 SIB Hydrogeological1nvestigation.doc <br /> <br />SIB <br />