My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-1025
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-1025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 2:36:25 PM
Creation date
2/21/2007 12:48:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-1025
Date (mm/dd/yyyy)
12/14/2006
Description
Approv. FIRST AMENDMENT to BEISWENGER HOCH & ASSOC - Central Island Drainage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2.2.3 Pavement Evaluation and Geotechnical Information <br /> <br />Pavement core drilling and additional geotechnical information will be obtained <br />from the "Field Exploration Program" of October 17, 2003. This information was <br />recorded during the Gwen Margolis Value Engineering evaluation. <br /> <br />2.3 Drainage Design <br /> <br />2.3.1 Storm Runoff Water Quality Compliance <br /> <br />The consultant will develop the final drainage design of the selected alternative <br />from the Value Engineering Report of November 2003. The new drainage design <br />will include the design of runoff collection system and drainage wells for <br />exfiltration to the lower stratum. <br /> <br />Geotechnical information for estimation of the hydraulic conductivity of the upper <br />soils will be taken from the "Subsurface Exploration Report" recorded October <br />17, 2003 by Ardaman and Associates and "Report of Geotechnical Investigation" <br />recorded on January 23, 2002 by Geo Verse Inc. <br /> <br />Water quality criteria will be per DERM and Florida Department of Environmental <br />Protection (FDEP) recommendations. Drainage structures, miscellaneous piping <br />and construction procedures will be as per the latest "Roadway and Traffic <br />Design Standards" January 2003, edition. <br /> <br />2.3.2 Design Parameters <br /> <br />The consultant will design the proposed drainage system in compliance with the <br />latest Florida Department of Transportation (FDOT) standards applicable to <br />Miami Dade Department of Environmental Resources Management (DERM). <br /> <br />Rainfall intensity charts, time of concentration and imperviousness coefficients <br />will be as per FDOT recommendations. <br /> <br />This proposal also includes the design of drainage facilities on streets with no <br />storm sewer system, Existing drainage structures with no beneficial use for the <br />project will be removed from the work place. <br /> <br />2.4 Signing and Pavement Marking <br /> <br />Signing and pavement marking for the newly replaced pavement surface will be <br />in compliance with the latest FDOT standards and the "Manual on Uniform Traffic <br />Control Devices" (MUTCD) 2000, issue. <br /> <br />SIB <br /> <br />Beiswenger. Hoch and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.