My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-1025
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-1025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 2:36:25 PM
Creation date
2/21/2007 12:48:06 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-1025
Date (mm/dd/yyyy)
12/14/2006
Description
Approv. FIRST AMENDMENT to BEISWENGER HOCH & ASSOC - Central Island Drainage
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.0 Summary of Quantities <br /> <br />The Consultant will prepare the summary of quantities and pay items. The <br />summary of quantities will be in compliance with the latest FOOT standards. <br /> <br />4.0 Technical Specifications and Special Provisions <br /> <br />Technical specifications and special provisions shall comply with the latest <br />FOOT, MUTCD and DCPWD standard specifications. <br /> <br />5.0 Permits <br /> <br />The Consultant will coordinate with government agencies having jurisdiction on <br />the natural resources or environmental assessments and permitting. <br />Coordination meetings plan preparation, and permit filing with DERM and <br />another regulating agencies is part of the Consultant services and scope of work. <br /> <br />6.0 Time for Completion for Phase II, Final Drainage Design and Pavement <br />Improvements <br /> <br />The estimated time for completion of the above Phase II scope of services is 6.0 <br />months from the written "Authorization to Procp.erJ" from the City <br /> <br />During the project development, the Consultant will prepare draft submittals for <br />utility review meetings, DERM and City of Sunny Isles Beach reviews. The <br />Consultant will be responsible for the initial contact with all the affected utility <br />companies. Prior to start engineering design works of this phase, the Consultant <br />will prepare a work schedule for the City of Sunny Isles review and approval. <br /> <br />B.- Scope of Services for Phase 1I1, Technical Assistance During the Bidding <br />Process <br /> <br />1.0 The Technical Assistance during the bidding process include but is not <br />limited to the following: <br /> <br />. Preparation and organization of the Public Awareness Conference. <br />. Preparation of Request for Proposal (RFP) documentation. <br />. Invitation to Bidders <br />. Pre-bid conference <br />. Review of Bidders documentation <br />. Miscellaneous consulting engineering services. <br /> <br />2.0 Time for Completion of Phase III, Technical Assistance <br /> <br />The estimated time for this phase is 2.0 months. <br /> <br />S\\3 <br /> <br />Beiswenger, Hoch and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.