Laserfiche WebLink
<br />As requested by the Client, Consultant shall incoqJorate <br />locations of injection wells as required for the Client's <br />off-site drainage improvement project into this Project. <br />Consultant will not be responsible for design, permitting, <br />construction observation or contract administration <br />associated with the off-site drainage improvement <br />project. Consultant will assist and coordinate with the <br />Clients consulting engineer for this work. <br /> <br />Scope is for a design/bid/build process. If Client follows <br />a design/build or CM type process, Consultant may <br />modify the lee and scope for additional coordination <br />and/or design services. <br /> <br />Phase 22, (site/Engineering Construction Services) of <br />the approved scope of services dated September 5, <br />2001 is not under this Scope of Services and shall be . <br />billed under the original agreement. <br /> <br />3.0 INFORMATION TO BE PROVIDED BY CLIENT <br /> <br />3.1 Updated information regarding the adjacent roadway, <br />drainage, electric and other utilities may be required to <br />service the proposed park project. <br /> <br />3.2 All contracting and administrative direction in conjunction <br />with the new consultant for the off-site drainage <br />improvement portion of the Project. <br /> <br />3.3 Program elements for the Recreation building's first and <br />second floors and the gymnasium. <br /> <br />4.0 SCOPE OF BASIC SERVICES AND FEE <br /> <br />The scope of services to be provided by Consultant shall be divided into <br />twenty two (22) tasks as follows: <br /> <br />PLANNING TASKS <br /> <br />Task 1. <br /> <br />Site Plan Preparation and Processing <br /> <br />A. Preparation and Processing - Consultant shall <br />revise the 100% submittal site plan based on comments <br />and revisions generated after the 100% plan submittal <br />date. Consultant shall coordinate the submittal of the site <br />plan package to the City of Sunny Isles Beach, including <br />the site plan, iandscape plan, lighting plan, preliminary <br /> <br />Page 2 of 11 Initial: MLA\~ Client: ~ <br />~,\ '0 <br />