My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1080
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:08 AM
Creation date
6/20/2007 1:34:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1080
Date (mm/dd/yyyy)
04/19/2007
Description
1st Amendment w/ Miller Legg: Construction Observation Srv/Active Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 2. <br /> <br />Task 3. <br /> <br />engineering and architectural plans. New 50%, 90%, and <br />100% subrTiillal sets will-be disiributed-for review bY-the <br />Client. Consultant shall allend the following regularly <br />scheduled meetings: <br /> <br />1. Two (2) review submillal meetings. <br /> <br />FEE: Lump Sum of $4,600. <br /> <br />B. Additional Revisions - Revisions required by each <br />reviewing agency upon review of the new 50%, 90%, and <br />100% submillals are included in this fee. Subsequent <br />revisions or revisions required by concept changes shall be <br />provided as additional services and shall be invoiced on an <br />hourly basis. The fee for this task is estimated not to <br />exceed $1,000 without prior authorization from Client. <br /> <br />FEE: Hourly per the allached Rate Schedule. <br /> <br />Calculated Site Plan <br /> <br />A. Preparation - Consultant shall revise the previously <br />submilled 100% submillal horizontal control plan of the <br />project to reflect the proposed changes. This plan shall <br />show the bearings and distances of the property lines, <br />center lines, right-of-way lines and easement lines and the <br />dimensions of buildings, pavement, landscape areas and <br />other site improvements. This task does not include the <br />preparation of a coordinate point map. <br /> <br />FEE: Lump Sum of $1,500. <br /> <br />B. Additional Revisions . Revisions required by <br />minor/major architectural or other coordination needs shall <br />be on an hourly basis. The fee for this task is estimated <br />not to exceed $300 without prior authorization from Client. <br /> <br />FEE: Hourly per the allached Rate Schedule. <br /> <br />Preliminary Development Cost Estimate - Consultant <br />shall prepare a pre-development cost estimate of the <br />Project. The cost estimate shall consist of earthwork, <br />paving, drainage, water and sewer, architectural, lighting, <br />planting, irrigation, site amenities and fencing <br />improvements. <br /> <br />FEE: Lump Sum of $2,000. <br /> <br />Page 3 of 11 <br /> <br />Initial: MLA:nCH.enl:.~ <br />~) \ v <br />
The URL can be used to link to this page
Your browser does not support the video tag.