My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1080
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:08 AM
Creation date
6/20/2007 1:34:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1080
Date (mm/dd/yyyy)
04/19/2007
Description
1st Amendment w/ Miller Legg: Construction Observation Srv/Active Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 10. <br /> <br />Task 11. <br /> <br />Task 12. <br /> <br />meeUhe_minimum_ requirements_ of Jhe _City _otSu nny -'sles <br />Beach for submittal ta the Client as part of the site plan <br />package. Site lighting will include lighting of the lillle league <br />field. The plans shall indicate pole locations and fixture <br />lumens and shall include details of lighting fixtures <br />(foundations) and poles (and an isofootcandle drawing). <br />Plans and specifications shall be submilled to the Client for <br />approval. Lighting specifications and materials shall be <br />value conscious and include notes and details sufficient for <br />competitive bidding. <br /> <br />FEE: Lump Sum of $1,500. <br /> <br />Site Amenities Design - Consultant shall revise the <br />previously submilled 100% site amenities plans and details <br />to meet the minimum requirements of the City of Sunny <br />Isles Beach for submittal to the Client as part of the site <br />plan package. Site amenities revision will include <br />perimeter fence, multi-purpose court equipment, benches, <br />drinking fountains, trash receptacles, and specialty paving. <br />Site amenities specifications and materials shall be value <br />conscious and include notes and details sufficient for <br />competitive bidding. <br /> <br />FEE: Lump Sum of $2,300. <br /> <br />ENGINEERING TASKS <br /> <br />Preliminary Engineering <br /> <br />A. Preparation - Consultant shall prepare conceptual <br />plans for the drainage, water and sewer systems for the <br />project. These plans shall be submilled to the Client as <br />part of the site plan package. <br /> <br />FEE: Lump Sum of $2,230. <br /> <br />B. Additional Revisions - Revisions required by each <br />reviewing agency upon review of the initial submittal shall <br />be included in this fee. Subsequent revisions or revisions <br />required by concept changes shall be provided as <br />additional services and shall be invoiced on an hourly <br />basis. The fee for this phase is estimated not to exceed <br />$750 without prior authorization from Client. <br /> <br />FEE: Hourly per the attached Hourly Rate Schedule. <br /> <br />Conceptual Water Management Plan - Consultant shall <br />prepare a conceptual water management plan for the <br />project which shall include construction details for a d~e _ A <br />Page 6 of 11 Initial: MLA: 1M . . Client: -.!.E r <br />~, 'I <br />.) h <br />
The URL can be used to link to this page
Your browser does not support the video tag.