My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1080
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:08 AM
Creation date
6/20/2007 1:34:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1080
Date (mm/dd/yyyy)
04/19/2007
Description
1st Amendment w/ Miller Legg: Construction Observation Srv/Active Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 7. <br /> <br />Task 8. <br /> <br />Task 9. <br /> <br />shall be invoiced on an hourly basis. The fee for this task <br />is-estimated-not-to-exceed-$1 ;OOO-without- prior <br />authorization from Client. <br /> <br />FEE: Hourly per the attached Rate Schedule. <br /> <br />Irrigation Design <br /> <br />A. Plan Preparation - Consultant. shall revise the <br />previously submitted 100% irrigation construction <br />documents to reflect the changes to the Recreation <br />building. The irrigation construction documents will include <br />location, quantity and size of proposed irrigation materials <br />for installation. The water source for the irrigation system <br />will be potable water. Revisions required by the Client <br />upon review of the 50%, 90%, and 100% submittals are <br />included in this fee. <br /> <br />FEE: Lump Sum of $1,500. <br /> <br />B. Additional Revisions - Subsequent reVISions or <br />revisions required by concept, architectural, site plan, or <br />utility changes shall be provided as additional services and <br />shall be invoiced on an hourly basis. The fee for this task <br />is estimated not to exceed $300 without prior authorization <br />from Client. <br /> <br />FEE: Hourly per the attached Rate Schedule. <br /> <br />Little League Ball Field Lighting Design - Site lighting <br />plans and specifications for the little league baseball field <br />shall be prepared by Delta G Consulting Engineer's Inc., a <br />sub-consultant, and shall meet the minimum requirements <br />of the City of Sunny Isles Beach for submittal to the Client <br />as part of the site plan package. Lighting of the little league <br />baseball field was not included in the original scope of work <br />and added during the design and review process with the <br />Client. The plans shall indicate pole locations and fixture <br />lumens and shall include details of lighting fixtures <br />(foundations) and poles (and an isofootcandle drawing). <br />Plans and specifications shall be submitted to the Client for <br />approval. Lighting specifications and materials shall be <br />value-conscious and include notes and details sufficient for <br />competitive bidding. <br /> <br />FEE: Lump Sum of $1,500. <br /> <br />Site Lighting Design - Re-design of the site lighting plans <br />and specifications shall be prepared by Delta G <br />Consulting Engineer's Inc., a sub-consultant, and shall <br /> <br />Page 5 of 11 Initial: MLAn Client: ~ <br />(,) \ u <br />
The URL can be used to link to this page
Your browser does not support the video tag.