Laserfiche WebLink
<br />ATTACHMENT A <br />PROJECT WORK PLAN <br /> <br />I. GRANTEE/PROJECT INFORMATION: <br /> <br />Grantee: City of Sunny Isles Beach <br />Project Title: SUNNY ISLES BEACH 172NU STREET DRAINAGE <br />DEP Grant #: LP6861 <br /> <br />II. FUNDING PLAN: <br /> <br /> LP Grant Total <br />Category of Expenditure Funds Provided Match Reauired Fundin!! <br />Professional Services $100,000 $100,000 $200,000 <br />Construction & Demolition $200,000 $200,000 $400,000 <br />Equipment <br />Land <br />Other (Specify) <br />Total $300,000 $300,000 $600,000 <br /> <br />III. SCOPE OF WORK: <br />The Florida Department of Environmental Protection (Department) and the City of Sunny Isles Beach <br />(Contractor) agree that the primary objectives of this project consist of the following: <br /> <br />The City is proposing to develop a multi-year, multi-use stormwater collection system project in a <br />residential area adjacent to Collins Avenue (A-I-A) on I720d Street. The primary purpose for this <br />facility will be to mitigate flooding, reduce ponding, improve stormwater flows, and decrease the level <br />of debris prior to it entering the receiving body. <br /> <br />The City has already acquired the necessary right-of-way, so no funding will be needed for land <br />acqulSltlOn. We will use the funding for preliminary site planning (including development of a <br />management plan and surveying needs), design, and layout. The City requests that the agreement be <br />written with as much flexibility as possible to allow funding to be moved from professional services <br />and construction categories as needed. The time frame for this project is four years. <br /> <br />Invoicing will take place quarterly at a minimum and the City will provide an annual status report to <br />the DEP. <br /> <br />Scope Detail: <br /> <br />1. Consultants will be responsible for completing surveys associated with site assessment <br />(topographic, geotechnical, tree, jurisdictional wetlands, etc) necessary to develop overall project <br />design. <br /> <br />2. The Contractor will be responsible for the fmal project plan and implementation of the plan. The <br />project plan shall include surveys, construction drawings, time lines, detailed budget information, <br />bid documents and any subcontracts. Copies of the final plans shall be submitted to the <br />Department for review and approval. <br /> <br />3. The Consultant will be responsible for obtaining all necessary permits/authorizations. <br /> <br />SIB <br />