Laserfiche WebLink
F <br />0 <br />r. <br />C <br />F11 <br />H <br />Ll <br />r, <br />n <br />n <br />r <br />F <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1 - GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. General provisions of Contract, including General and Supplementary <br />Conditions. <br />B. Other Division -1 Specification Sections. <br />1.02 SECTION INCLUDES <br />A. Administrative and procedural requirements for determining Work completed <br />under unit price contract. <br />1.03 GENERAL REQUIREMENTS <br />A. Lump Sum and unit prices shall include the providing of all costs required for the <br />complete demolition as noted, construction of the specified unit of work including <br />cost of materials and delivery; cost of installation labor, including social security, <br />insurance, and other required fringe benefits, workman's compensation <br />insurance; bond premiums; rental of equipment and machinery; taxes; testing; <br />surveys and other incidental expenses; and supervision. <br />B. The Owner reserves the right to reject the Contractor's measurement of <br />completed work that involves use of established unit prices, and to have this <br />Work measured by an independent surveyor acceptable to the Contractor at the <br />Owner's expense. <br />C. Contract Sum adjustments will be by Change Order on basis of net accumulative <br />change for each unit price category. <br />1. Except as otherwise specified, unit prices shall apply to both deductive <br />and additive variations of quantities. <br />2. Lump sum and unit prices in the Agreement shall remain in effect until <br />date of final completion of the entire Work. <br />D. Partial payment for material and equipment properly stored and protected will be <br />made in accordance with requirements of the General Conditions. <br />E. Payment will be made at the respective contract unit and lump sum price for <br />each item shown in the Agreement, installed and accepted, which price and <br />payment shall constitute full compensation for furnishing all materials and <br />performing all Work in connection therewith and incidental thereto. No separate <br />payment will be made for testing. <br />1 06/07 01025 -1 <br />03 -4197 <br />