My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br />2. Payment for relocating existing mailboxes will be made at the unit price name <br />in the Bid Schedule, which price shall constitute full compensation for the <br />complete relocation of the mailboxes including posts. Mailboxes shall be <br />relocated in accordance with postal regulations. <br />3. No separate payment shall be made for temporary relocation of existing <br />mailboxes required during construction. <br />Q. Furnish and Install Pavement Marking <br />1. Measurement for payment for furnishing and installing pavement markings <br />will be based upon the number of linear feet of such markings actually <br />constructed as determined by measurement along the centerline of the <br />pavement markings in place, all in accordance with the Contract Documents. <br />2. Payment for furnishing and installing pavement markings will be made at the <br />unit price per linear foot of pavement markings named in the Bid Schedule, <br />which price shall constitute full compensation for the complete installation. <br />3. Payment for restoration of existing pavement markings shall be made at the <br />unit prices for furnishing and installing pavement markings named in the Bid <br />Schedule. Locations and quantities of such existing pavement markings to be <br />restored shall be verified with the ENGINEER prior to disturbing the existing <br />pavement markings. <br />R. Furnish and Install Reflective Pavement Markers <br />1. Measurement for payment for furnishing and installing raised reflective <br />pavement markers (RPM) will be based upon the actual number, each, of <br />such RPM's installed, all in accordance with the Contract Documents. <br />2. Payment for furnishing and installing RPM's will be made at the unit price, <br />each, named in the Bid Schedule, which price shall constitute full <br />compensation for the complete installation. <br />S. Relocate or Adjust Existing Street Sign <br />1. Measurement for payment to adjust existing signs will be based upon the <br />actual quantity, each, of such signs relocated of adjusted, all in accordance <br />with the Contract Documents. <br />2. Payment for relocating or adjusting existing signs will be made at the unit <br />price, each, named in the Bid Schedule, which price shall constitute full <br />compensation for the work of relocating or adjusting existing signs and all <br />else necessary for a complete and functional installation. <br />06/07 01025 -7 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.