My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ai <br />T. Remove and Dispose Existing Street Sign <br />1. Measurement for payment to remove and dispose existing signs will be <br />based upon the actual quantity, each, of such signs actually removed from <br />the right -of -way, all in accordance with the Contract Documents. <br />2. Payment for removal and disposal of existing signs will be made at the unit <br />price, each, named in the Bid Schedule, which price shall constitute full <br />compensation for the removal and disposal of existing signs. <br />U. Furnish and Install Street Signs (With Post) <br />1. Measurement for payment to furnish and install signs will be based upon the <br />actual quantity, each, of such signs furnished and installed, all in accordance <br />with the Contract Documents. <br />2. Payment for furnishing and installing signs will be made at the unit price, <br />each, named in the Bid Schedule, which price shall constitute full <br />compensation for the completed installation of the sign including post, and all <br />else necessary for a complete and functional installation. <br />V. Furnish and Install Text or Directional Arrow <br />1. Measurement for payment to furnish and install text or directional arrows will <br />be based upon the actual quantity, each, of such text or directional arrows <br />furnished and installed, all in accordance with the Contract Documents. <br />2. Payment for furnishing and installing text or directional arrows will be made at <br />the unit price, each, text or arrow with associated lines, named in the Bid <br />Schedule, which price shall constitute full compensation for the work of the <br />complete installation. <br />W. Relocate Existing Utility Poles <br />1. Measurement for payment for relocation of existing utility poles will be based <br />upon the actual number of utility poles relocated, all in accordance with the <br />Contract Documents. <br />2. Payment for relocating existing utility poles will be made at the unit price <br />name in the Bid Schedule, which price shall constitute full compensation for <br />the complete relocation of the utility poles. Utility poles shall be relocated in <br />accordance with local or governing power company regulations. <br />3. No separate payment shall be made for temporary relocation of existing utility <br />poles required during construction. <br />X. Project Mobilization <br />1. The project mobilization item shall be administered in accordance with the <br />Florida Department of Transportation, Standard Specifications for Road & <br />Bridge Construction (latest edition); MOBILIZATION. <br />06/07 01025 -8 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.