Laserfiche WebLink
K17;% <br />� <br />Ijl <br />R 11411 <br />r�i <br />2. The maximum amount allowed for the mobilization item shall be ten percent <br />(10 %) of the total contract amount. <br />3. Mobilization includes, but is not limited to, mobilization of equipment, all <br />surveying, all supervision, cost of all bonds and warranties, all permit fees, <br />and all insurance. <br />3.02 PROTECTION <br />A. Where pavement, trees, shrubbery, fences or other property or surface structures <br />have been damaged, removed or disturbed by the Contractor, whether <br />deliberately or through failure to carry out the requirements of the Contract <br />Documents, state laws, municipal ordinances or the specific direction of the <br />Engineer, or through failure to employ usual and reasonable safeguards, such <br />property and surface structures shall be replaced or repaired at the expense of <br />the Contractor to a condition equal to that before work began within a time frame <br />approved by the Engineer. <br />3.03 SUBMITTALS <br />A. On lump sum items, a complete schedule of values must be submitted at the pre - <br />construction meeting by the contractor. <br />END OF SECTION <br />06/07 01025 -9 03 -4197 <br />