My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />SECTION 01030 <br />SPECIAL PROJECT PROCEDURES <br />PART 1 - GENERAL <br />1.01 OBSTRUCTIONS <br />06/07 01030 -1 03 -4197 <br />A. <br />The attention of the Contractor is drawn to the fact that during construction at the <br />Project site, the possibility exists of the Contractor encountering various water, <br />sewer, petroleum, gas, telephone, electrical, or other lines not shown on the <br />Drawings. The Contractor shall exercise extreme care before and during <br />construction to locate and flag these lines so as to avoid damage to the existing <br />lines. Should damage occur to an existing line, the Contractor shall repair the line <br />at no cost to the Owner. <br />1.02 PROVISIONS FOR THE CONTROL OF DUST <br />A. <br />Sufficient precautions shall be taken during construction to minimize the amount of <br />dust created. Wetting down the site may be required or as directed by the <br />Engineer to prevent dust as a result of vehicular traffic. <br />1.03 RELOCATIONS <br />A. <br />The Contractor shall be responsible for the relocation of structures, including but <br />not limited to light poles, signs, sign poles, fences, piping, conduits and drains that <br />interfere with the positioning of the work as set out on the Drawings. The cost of <br />all such relocations shall be included in the bid for the project and shall not result in <br />any additional cost to the Owner. <br />1.04 WARRANTIES <br />A. <br />All equipment supplied under these Specifications shall be warranted by the <br />Contractor and the equipment manufacturers for a of one (1) <br />period year. <br />Warranty period shall commence on the date of Owner acceptance. <br />B. <br />The equipment shall be warranted to be free from defects in workmanship, design <br />and materials. If any part of the equipment should fail during the warranty period, it <br />shall be replaced in the machine(s) and the unit(s) restored to service at no <br />expense to the Owner. <br />C. <br />The manufacturer's warranty period shall run concurrently with the Contractor's <br />warranty or guarantee period. No exception to this provision shall be allowed. <br />D. <br />In the event that the manufacturer is unwilling to provide a one year warranty <br />commencing at the time of Owner acceptance, the Contractor shall obtain from the <br />manufacturer a two (2) year warranty starting at the time of Owner acceptance of <br />the equipment. <br />06/07 01030 -1 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.