My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ij <br />hAl", <br />H <br />H <br />ri <br />N <br />N, <br />pr� <br />n <br />n <br />C <br />4 <br />1.05 HURRICANE PREPAREDNESS PLAN <br />A. Within ten days of the date of Notice to Proceed, the Contractor shall submit to the <br />Engineer and Owner a Hurricane Preparedness Plan. The plan should outline the <br />necessary measures, which the Contractor proposes to perform at no additional <br />cost to the Owner in case of a hurricane warning. <br />B. In the event of inclement weather or whenever the Engineer shall direct; the <br />Contractor will cause Subcontractors to protect carefully the Work and materials <br />against damage or injury from the weather. If, in the opinion of the Engineer, any <br />portion of Work or materials shall have been damaged or injured by reason of <br />failure on the part of Contractor or any Subcontractor to so protect the Work, such <br />Work and materials shall be removed and replaced at the expense of the <br />Contractor. <br />1.06 EQUIPMENT, TESTING & INSPECTION <br />A. Regardless of the number of days specified in the individual sections for the <br />manufacturers representative to be present on the site for inspection and testing, if <br />the equipment fails to perform as specified then the representative shall remain on <br />site until the malfunction is corrected and the Owner received specified days of <br />inspection or testing. <br />B. The cost for the additional days required shall not be added to the cost of the <br />Owner, but shall be to the account of the Contractor. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />END OF SECTION <br />06/07 01030 -2 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.