My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br />W <br />ftl <br />I` <br />I� <br />r jr <br />B. Submittals Schedule for Shop Drawings, and Samples in accordance with <br />Section 01340. Show: <br />1. The dates for Contractor's submittals. <br />2. The dates submittals will be required for owner furnished products, if <br />applicable. <br />3. The dates approved submittals will be required from the Engineer. <br />C. A list of all long lead items (equipment, materials, etc). <br />1.05 PROGRESS REVISIONS <br />A. Indicate progress of each activity to date of submission. <br />B. Show changes occurring since previous submission of schedule: <br />1. Major changes in scope. <br />2. Activities modified since previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the schedule. <br />2. Corrective action recommended, and its effect. <br />The effect of changes on schedules of other prime contractors. <br />1.06 SUBMISSIONS <br />A. Submit initial schedules to the Engineer within 10 days after the effective date of <br />the Agreement. <br />1. The Engineer will review schedules and return review copy within 21 days <br />after receipt. <br />2. If required, resubmit within 7 days after return of review copy. <br />B. Submit 5 copies of revised monthly progress schedules with that month's <br />application for payment. <br />06/07 01310 -3 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.