My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />B. Format of listings: The chronological order of the start of each item of work for <br />each structure. <br />C. Identification of listings: By major specification section numbers as applicable <br />and structure. <br />oil 1.04 CONTENT OF SCHEDULES <br />A. Construction Progress Schedule: <br />1. Show the complete sequence of construction by activity. <br />2. Show the dates for the beginning of, and completion of, each major <br />element of construction in no more than a two -week increment scale. <br />Specifically list, but not limited to: <br />a. Receiving Materials <br />b. Pipeline Installations <br />C. Testing <br />d. Restoration <br />e. Startup <br />f. Record Drawings <br />g. Permits <br />h. Punch List <br />i. Owner Activities, Including Inspections <br />3. Show projected percentage of completion for each item, as of the first of <br />each month. <br />4. Show projected dollar cash flow requirements for each month of <br />construction. <br />V <br />5. Use of float suppression techniques such as preferential sequencing or <br />logic, special lead /lag logic restraints, and extended activity times are <br />prohibited, and use of float time disclosed or implied by use of alternate <br />float- suppression techniques shall be shared to proportionate benefit of <br />the Owner and Contractor. <br />6. Pursuant to above float- sharing requirement, no time extensions will be <br />granted nor delay damages paid until a delay occurs which (i) impacts <br />Project's critical path, (ii) consumes available float or contingency time, <br />and (iii) extends work beyond contract completion date. <br />7. If the Contractor provides an accepted schedule with an early completion <br />date, the Owner reserves the right to reduce the duration of the work to <br />match the early completion date by issuing a deductive Change Order at <br />no change in Contract Price. <br />06/07 01310 -2 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.