My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br />L <br />V1 <br />Hill <br />kllil <br />#! <br />C. Designate in the construction schedule, <br />the dates for submission and the dates <br />Drawings and Samples will be needed. <br />1.03 CONTRACTOR'S RESPONSIBILITY <br />or in a separate coordinated schedule, <br />that reviewed Shop Drawings, Working <br />A. It is the duty of the Contractor to check all drawings, data and samples prepared <br />by or for him before submitting them to the Engineer for review. Each and every <br />copy of the Drawings and data shall. bear Contractor's stamp or will be returned to <br />the Contractor for conformance with this requirement. Shop drawings shall <br />indicate any deviations in the submittal from requirements of the Contract <br />Documents. <br />B. Determine and verify: <br />Field measurements <br />2. Field construction criteria <br />3. Catalog numbers and similar data <br />4. Conformance and Specifications <br />C. The Contractor shall furnish the Engineer a schedule of Shop Drawing submittals <br />fixing the respective dates for the submission of shop and working drawings, the <br />beginning of manufacture, testing and installation of materials, supplies and <br />equipment. This schedule shall indicate those that are critical to the progress <br />schedule. <br />D. The Contractor shall not begin any of the work covered by a drawing, data, or a <br />sample returned for correction until a revision or correction thereof has been <br />reviewed and returned to him, by the Engineer approved. <br />E. The Contractor shall submit to the Engineer all drawings and schedules <br />sufficiently in advance of construction requirements to provide no less than <br />twenty -one (21) calendar days for checking and appropriate action from the time <br />the Engineer receives them. <br />F. The Contractor shall submit three (3) copies of descriptive or product data <br />submittals to complement shop drawings for the Engineer plus the number of <br />copies that the Contractor requires. The Engineer will retain three (3) sets. All <br />blueprint shop drawings shall be submitted with one (1) set of reproducible and <br />four (4) sets of print. The Engineer will review the drawings and return to the <br />Contractor the set of marked -up drawings with appropriate review comments. <br />G. The Contractor shall be responsible for and bear all cost of damages that may <br />result from the ordering of any material or from proceeding with any part of work <br />prior to the review by Engineer of the necessary Shop Drawings. <br />01340 -2 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.