My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-11 <br />1 1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br />A. The Engineer's review of drawings, data and samples submitted by the <br />Contractor will cover only general conformity to the Specifications, external <br />connections, and dimensions that affect the installation. The Engineer's review <br />and exceptions if any, will not constitute an approval of dimensions, quantities, <br />and details of the material, equipment, device, or item shown. <br />B. The review of drawings and schedules will be general, and shall not be <br />construed: <br />1. As permitting any departure from the Contract requirements; <br />2. As relieving the Contractor of responsibility for any errors, including <br />details, dimensions, and materials; <br />3. As approving departures from details furnished by the Engineer, except as <br />otherwise provided herein. <br />C. If the drawings or schedule as submitted describe variations per subparagraph <br />(1.05.C), and show a departure from the Contract requirements which Engineers <br />finds to be in the interest of the Owner and to be minor as not to involve a change <br />in the Contract Price or time for performance, the Engineer may return the <br />reviewed drawings without noting an exception. <br />D. When reviewed by the Engineer, each of the Shop Drawings will be identified as <br />having received such review being so stamped and dated. Shop Drawings <br />stamped "REJECTED" and with required corrections shown will be returned to <br />the Contractor for correction and re- submittal. <br />E. Re- submittals will be handled in the same manner as the first submittals. On <br />resubmittals, the Contractor shall direct specific attention, in writing or on <br />resubmitted Shop Drawings, to revisions other than the corrections requested by <br />the Engineer on previous submissions. The Contractor shall make any <br />corrections required by the Engineer. <br />F. If the Contractor considers any correction indicated on the drawings to constitute <br />a change to the Contract Drawings or Specifications, the Contractor shall give <br />j written notice thereof to the Engineer. <br />G. The Engineer will review a submittal /resubmittal a maximum of three (3) times <br />after which cost of review will be borne by the Contractor. The cost of <br />engineering shall be equal to the Engineer's charges to the Owner under the <br />terms of the Engineer's agreement with the Owner. <br />H. When the Shop Drawings have been completed to the satisfaction of the <br />Engineer, the Contractor shall carry out the construction in accordance therewith <br />and shall make no further changes therein except upon written instructions from <br />the Engineer. <br />1 06/07 01340 -3 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.