My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wi <br />I <br />E. Moving parts shall be rotated a minimum of once weekly to insure proper <br />lubrications and to avoid metal -to -metal "welding ". Upon installation of the <br />equipment, the Contractor shall start the equipment, at least half load, once <br />! weekly for an adequate period of time to insure that the equipment does not <br />deteriorate from lack of use. <br />F. All materials which, in the opinion of the Engineer, have become so damaged as <br />to be unfit for the use intended or specified shall be promptly removed from the <br />site of the work, and the Contractor shall receive no compensation for the <br />damaged material or its removal. <br />G. Arrange storage in a manner to provide easy access for inspection. Make <br />periodic inspections of stored Products to assure that Products are maintained <br />under specific conditions, and free from damage or deterioration. <br />H. Protection After Installation: <br />1. Provide substantial coverings as necessary to protect installed products <br />from damage from traffic and subsequent construction operations. <br />Remove covering when no longer needed. <br />I. The Contractor shall be responsible for all materials, equipment, and supplies <br />sold and delivered to the Owner under this Contract until final inspection of the <br />work and acceptance thereof by the Owner. In the event any such material, <br />equipment, and supplies are lost, stolen, damaged, or destroyed prior to final <br />inspection and acceptance, the Contractor shall replace same without additional <br />cost to the Owner. <br />Should the Contractor fail to take proper action on storage and handling of <br />equipment supplied under this Contract within seven days after written notice to <br />do so has been given, the Owner retains the right to correct all deficiencies noted <br />in previously transmitted written notice and debit the cost associated with these <br />corrections from the Contractor's Contract. These costs may be comprised of <br />expenditures for labor, equipment usage, administrative, clerical, engineering and <br />any other costs associated with making the necessary corrections. <br />1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br />A. Products List: <br />1. Within 30 days after the effective date of the Agreement, submit to the <br />Engineer a complete list of major products proposed to be used, with the <br />name of the manufacturer and the installing subcontractor. <br />B. Contractor's Options: <br />For Products specified only by reference standard, select any product <br />meeting that standard. <br />06/07 01600 -4 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.