My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4? <br />2. For Products specified by naming several products or manufacturers, <br />select any one of the products or manufacturers named, which complies <br />with the specifications. <br />3. For products specified by naming one or more Products or manufacturers <br />and "or equal ", Contractor must submit a request as for substitutions for <br />any Product or manufacturer. not specifically named. <br />C. Substitutions: <br />1. For a period of 30 days after the effective date of the Agreement, the <br />Engineer will consider written requests from Contractor for substitution of <br />Products. <br />4. No substitutions will be considered by the Engineer after 30 days from the <br />Contract Date. <br />D. Contractor's Representation: <br />1. A request for a substitution constitutes a representation that Contractor: <br />a. Has investigated the proposed Product and determined that it is <br />equal to or superior in all respects to that specified <br />b. Will provide the same warranties or bonds for the substitution as <br />for the Product specified <br />C. Will coordinate the installation of an accepted substitution into the <br />Work, and make such other changes as may be required to make <br />the Work complete in all respects <br />d. Waives all claims for additional costs, under his responsibility, <br />which may subsequently become apparent. <br />E. The Engineer will review requests for substitutions with reasonable promptness, <br />and notify Contractor, in writing, of the decision to accept or reject the requested <br />substitution. <br />06/07 01600 -5 <br />03 -4197 <br />2. Submit a separate request for each Product, supported with complete <br />data, with drawings and samples as appropriate, including: <br />a. Comparison of the qualities of the proposed substitution with that <br />specified <br />b. Changes required in other elements of the work because of the <br />substitution <br />C. Effect on the construction schedule <br />d. Cost data comparing the proposed substitution with the Product <br />specified <br />e. Any required license fees or royalties <br />f. Availability of maintenance service, and source of replacement <br />materials <br />3. The Engineer shall be the judge of the acceptability of the proposed <br />substitution. <br />4. No substitutions will be considered by the Engineer after 30 days from the <br />Contract Date. <br />D. Contractor's Representation: <br />1. A request for a substitution constitutes a representation that Contractor: <br />a. Has investigated the proposed Product and determined that it is <br />equal to or superior in all respects to that specified <br />b. Will provide the same warranties or bonds for the substitution as <br />for the Product specified <br />C. Will coordinate the installation of an accepted substitution into the <br />Work, and make such other changes as may be required to make <br />the Work complete in all respects <br />d. Waives all claims for additional costs, under his responsibility, <br />which may subsequently become apparent. <br />E. The Engineer will review requests for substitutions with reasonable promptness, <br />and notify Contractor, in writing, of the decision to accept or reject the requested <br />substitution. <br />06/07 01600 -5 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.