Laserfiche WebLink
E� <br />06/07 <br />C <br />3. Maintenance Procedures: <br />a. Routine operations <br />b. Guide to "trouble- shooting" <br />C. Disassembly, repair and reassembly <br />d. Alignment, adjusting and checking <br />4. Servicing and lubrication schedule <br />a. List of lubricants required <br />5. Manufacturer's printed operating and maintenance instructions <br />6. Description of sequence of operation by control manufacturer <br />7. Original manufacturer's parts list, illustrations, assembly drawings and <br />diagrams required for maintenance <br />a. Predicted list of parts subject to wear <br />b. Items recommended to be stocked as spare parts <br />8. As- installed control diagrams by controls manufacturer <br />9. Each contractor's coordination drawings <br />a. As- installed color coded piping diagrams <br />10. Charts of valve tag numbers, with location and function of each valve <br />11. List of original manufacturer's spare parts, manufacturer's current prices <br />and recommended quantities to be maintained in storage <br />12. Other data as required under pertinent sections of specifications <br />Contents, for each electric and electronic system, as appropriate: <br />1. Description of system and component parts <br />a. Function, normal operating characteristics, and limiting conditions <br />b. Performance curves, engineering data and tests <br />C. Complete nomenclature and commercial number of replaceable <br />parts <br />2. Circuit directories of panel- boards <br />a. Electrical service <br />b. Controls <br />3. As- installed color -coded wiring diagrams <br />4. Operating procedures: <br />01730 -5 03 -4197 <br />