My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
151, <br />R <br />111" <br />ilk <br />N <br />r; <br />NM <br />IP <br />FITI`�) <br />a. Routine and normal operating instructions <br />b. Sequences required <br />C. Special operating instructions <br />5. Maintenance procedures: <br />a. Routine operations <br />b. Guide to "trouble- shooting" <br />C. Disassembly, repair and reassembly <br />d. Adjustment and checking <br />6. Manufacturer's printed operating and maintenance instructions <br />7. List of original manufacturer's spare parts, manufacturer's current prices, <br />and recommended quantities to be maintained in storage. <br />8. Other data as required under pertinent sections of specifications <br />D. Prepare and include additional data when the need for such data becomes <br />apparent during instruction of Owner's personnel. <br />E. Additional requirements for operating and maintenance data: ' Respective <br />sections of Specifications. <br />F. Provide complete information for product specified. <br />1.08 SUBMITTAL SCHEDULE <br />A. Submit two copies of preliminary draft of proposed formats and outlines of <br />contents of Operation and Maintenance Manuals within 30 days after Notice to <br />Proceed. <br />1. The Engineer will review the preliminary draft and return one copy with <br />comments. <br />B. Submit two copies of completed data in final form no later than 30 days following <br />the Engineer's review of the last shop drawing and submittal specified under <br />Section 01340. <br />1. One copy will be returned with comments to be incorporated into final <br />copies. <br />C. Submit specified number of copies of approved data in final form directly to the <br />offices of the Engineer, Calvin, Giordano within 30 calendar days of product <br />shipment to the project site and preferably within 30 days after the reviewed copy <br />is received. <br />D. Submit six copies of addendum to the operation and maintenance manuals as <br />applicable and certificates as specified in paragraph 1.01B of Section 01030 <br />06/07 01730 -6 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.