Laserfiche WebLink
N111 <br />within 30 days after final inspection and plant start-up test. <br />E. Final Operation and Maintenance submittals shall be in large three ring binders <br />organized by specification Section and plainly marked per paragraph 1.04(C). <br />1.09 INSTRUCTION OF OWNER'S PERSONNEL <br />A. Prior to final inspection or acceptance, fully instruct Owner's designated <br />operating and maintenance personnel in operation, adjustment and maintenance <br />of products, equipment and systems. <br />B. Operating and maintenance manual shall constitute the basis of instruction. <br />1. Review contents of manual with personnel in full detail to explain all <br />aspects of operations and maintenance. <br />1.10 ENGINEER'S O & M CHECKLIST <br />A. The Engineer will review Operation and Maintenance Manuals submittals on <br />operating equipment for conformance with the requirements of this Section. The <br />review will generally be based upon the checklist presented on the following <br />pages (Table 01730) for the benefit of the Contractor and his suppliers. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />06/07 01730 -7 <br />03 -4197 <br />