My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />SECTION 02221 <br />TRENCHING, BEDDING, AND BACKFILL FOR PIPE <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Furnish labor, materials, equipment, and incidentals necessary to perform all <br />excavation, backfill, fill, grading and slope protection required to complete the <br />piping work shown on the Drawings and specified herein. The work shall <br />include, but not necessarily be limited to: catch basins, manholes, vaults, duct <br />conduit, pipe, and roadways and paving; all bedding, backfilling, fill and required <br />borrow; grading and disposal of surplus and unsuitable materials; and all related <br />work such as sheeting, bracing and water handling. <br />1.02 RELATED WORK <br />A. Section 02100: Site Preparation <br />1.03 QUALITY ASSURANCE <br />A. Codes and Standards: Perform excavation work in compliance with applicable <br />requirements of governing authorities having jurisdiction. <br />1.04 JOB CONDITIONS <br />A. The Contractor shall examine the site and review the available test borings or <br />undertake his own soil borings prior to submitting his bid, taking into <br />consideration all conditions that may affect his work. The Owner and Engineer <br />will not assume responsibility for variations of sub -soil quality or conditions at <br />locations other than places shown and at the time the investigation was made. <br />Boring log data is included in this section. <br />B. Existing Utilities: Locate existing underground utilities in the areas of work. If <br />utilities are to remain in place, provide adequate means of protection during <br />earthwork operations. <br />1. Should uncharted, or incorrectly , piping i p 9 in or other utilities be <br />encountered during excavation, consult the Engineer and the Owner of <br />such piping or utility immediately for directions. <br />2. Cooperate with Owner and utility companies in keeping respective <br />services and facilities in operation. Repair damaged utilities to <br />satisfaction of utility owner. <br />3. Demolish and completely remove from site existing underground utilities <br />indicated on the drawings to be removed. <br />1 06107 02221 -1 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.