Laserfiche WebLink
C. Protection of Persons and Property: Barricade open excavations occurring as <br />part of this work and post with warning lights. Operate warning lights as <br />recommended by authorities having jurisdiction. <br />1. Protect structures, utilities, sidewalks, pavements, and other facilities <br />from damage caused by settlement, lateral movement, undermining, <br />washout and other hazards created by earthwork operations. <br />1.05 TRENCH PROTECTION <br />A. The Contractor shall construct and maintain sheeting and bracing as required to <br />support the sides of excavations, to prevent any movement which could in any <br />way diminish the width of the excavation below that necessary for proper <br />construction, and to protect adjacent structures, existing piping and foundation <br />material from disturbance, undermining, or other damage. Care shall be taken <br />to prevent voids outside of the sheeting, but if voids are formed they shall be <br />immediately filled and compacted. <br />B. For pipe trench sheeting, no sheeting is to be withdrawn if driven below <br />mid - diameter of any pipe, and no wood sheeting shall be cut off at a level lower <br />than 1 foot above the top of any pipe unless otherwise directed by the Engineer. <br />If during the progress of the work the Engineer decides that additional wood <br />sheeting should be left in place, he may direct the Contractor in writing. If steel <br />sheeting is used for trench sheeting, removal shall be as specified above, unless <br />written approval is given by the Engineer for an alternate method of removal. <br />C. All sheeting and bracing, not left in place, shall be carefully removed in such a <br />manner as not to endanger the construction or other structures, utilities, existing <br />piping, or property. All voids left or caused by withdrawal of sheeting shall <br />immediately be refilled with sand or ramming with tools especially adapted to that <br />purpose, by watering or otherwise as may be directed. <br />D. The right g t of the Engineer to order sheeting and bracing left in place shall not be <br />construed as creating any obligation on his part to issue such orders, and his <br />failure to exercise his right to do so shall not relieve the Contractor from liability <br />for damages to persons or property occurring from or upon the work occasioned <br />by negligence or otherwise, growing out of a failure on the part of the Contractor <br />to leave in place sufficient sheeting and bracing to prevent any caving or moving <br />of the ground. <br />1.06 DEWATERING, DRAINAGE AND FLOATATION <br />A. The Contractor shall construct and place all drainage piping, structural fill and <br />bedding rock, in- the -dry. In addition, the Contractor shall make the final 24 <br />inches of excavation for this work in- the -dry and not until the water level is a <br />minimum of twelve inches below proposed bottom of excavation. <br />06/07 02221 -2 03 -4197 <br />