My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />SECTION 02223 <br />EXCAVATION BELOW NORMAL GRADE AND GRAVEL REFILL <br />PART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. If in the opinion of the Engineer, the material at or below the normal grade of the <br />bottom of the trench (0.7 feet below the invert of the pipe) is unsuitable for <br />foundation, it shall be removed to the depth directed by the Engineer and replaced <br />by drain rock, as specified in Section 02221 - Trenching, Bedding, and Backfill for <br />Pipe. <br />IS B. It shall be the Contractor's responsibility to provide trench safety systems such as <br />sheeting and bracing in accordance with state and local regulations. <br />1.02 RELATED WORK <br />A. Section 02221: Trenching, Bedding and Backfill for Pipe. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. Drain rock shall be 3/4 inch washed and graded limerock. The rock shall be graded <br />so that 99% will pass a 3/4 inch screen and 80% will be retained on a No. 8 <br />screen. Material meeting the Florida Department of Transportation Standard <br />Specifications for No. 57 stone shall be acceptable. <br />PART 3 - EXECUTION <br />3.01 EXCAVATION AND DRAINAGE <br />A. Whatever the nature of unstable material encountered or the groundwater <br />conditions, trench drainage shall be complete and effective. <br />B. If the Contractor excavates below grade through error or for his own convenience, <br />fence, <br />or through failure to properly dewater the trench, or disturbs the sub -grade before <br />dewatering is sufficiently complete, he may be directed by the Engineer to <br />excavate below grade as set forth in the preceding paragraph, in which case the <br />work of excavating below grade and finishing and placing the refill shall be <br />performed at his own expense. <br />1 06/07 02223 -1 <br />03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.